Engineering PapersSearch

Engineering topics

Furnas, Randall B.

Publications and source records attributed to Furnas, Randall B..

Design and implementation of a pilot orientation program for new NASA engineering employees

This paper describes the design and field testing of an orientation program for new employees of NASA Lewis Research Center's Engineering Directorate. A group of new employees designed the program using a series of TQM analysis techniques. The program objectives were: provide consistent treatment for new employees; assist management and clerical staff with their responsibility for orientation; introduce the employee to as many facets of the organization as possible; allow the employee to feel like a member of the organization as early as possible; maximize the use of existing services; and use up-to-date information. The major aspects of the program included: training of management and clerical staff; lab tours and briefings describing the organization; shepherding, using senior employees as shepherds; a handbook of information about the center and the directorate; a package of information about northeast Ohio; and social activities involving the new employees and shepherds. The program was tested on a pilot group of six new employees over a four month period and was considered to be highly successful by both the employees and management. Aspects of the program have subsequently been adopted for center-wide use.

Graham, Ronald E.

Space Logistics: Launch Capabilities

The current maximum launch capability for the United States are shown. The predicted Earth-to-orbit requirements for the United States are presented. Contrasting the two indicates the strong National need for a major increase in Earth-to-orbit lift capability. Approximate weights for planned payloads are shown. NASA is studying the following options to meet the need for a new heavy-lift capability by mid to late 1990's: (1) Shuttle-C for near term (include growth versions); and (2) the Advanced Lauching System (ALS) for the long term. The current baseline two-engine Shuttle-C has a 15 x 82 ft payload bay and an expected lift capability of 82,000 lb to Low Earth Orbit. Several options are being considered which have expanded diameter payload bays. A three-engine Shuttle-C with an expected lift of 145,000 lb to LEO is being evaluated as well. The Advanced Launch System (ALS) is a potential joint development between the Air Force and NASA. This program is focused toward long-term launch requirements, specifically beyond the year 2000. The basic approach is to develop a family of vehicles with the same high reliability as the Shuttle system, yet offering a much greater lift capability at a greatly reduced cost (per pound of payload). The ALS unmanned family of vehicles will provide a low end lift capability equivalent to Titan IV, and a high end lift capability greater than the Soviet Energia if requirements for such a high-end vehicle are defined.In conclusion, the planning of the next generation space telescope should not be constrained to the current launch vehicles. New vehicle designs will be driven by the needs of anticipated heavy users.

Furnas, Randall B.