Engineering Papers⌕ Search

Engineering topics

Frazier, Christopher Rawls

Publications and source records attributed to Frazier, Christopher Rawls.

At least 19 records

Uncertainty Analysis Framework for the Hospital Resource Supply Model for Covid-19

In March and April of 2020 there was widespread concern about availability of medical resources required to treat Covid-19 patients who become seriously ill. A simulation model of supply management was developed to aid understanding of how to best manage available supplies and channel new production. Forecasted demands for critical therapeutic resources have tremendous uncertainty, largely due to uncertainties about the number and timing of patient arrivals. It is therefore essential to evaluate any process for managing supplies in view of this uncertainty. To support such evaluations, we developed a modeling framework that would allow an integrated assessment in the context of uncertainty quantification. At the time of writing there has been no need to execute this framework because adaptations of the medical system have been able to respond effectively to the outbreak. This report documents the framework and its implemented components should need later arise for its application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Resource Supply-Demand-Routing Model for the COVID-19 Crisis

As part of the Department of Energy response to the novel coronavirus disease (COVID-19) pandemic of 2020, a modeling effort was sponsored by the DOE Office of Science. Through this effort, an integrated planning framework was developed whose capabilities were demonstrated with the combination of a treatment resource demand model and an optimization model for routing supplies. This report documents this framework and models, and an application involving ventilator demands and supplies in the continental United States. The goal of this application is to test the feasibility of implementing nationwide ventilator sharing in response to the COVID-19 crisis. Multiple scenarios were run using different combinations of forecasted and observed patient streams, and it is demonstrated that using a "worst-case forecast for planning may be preferable to best mitigate supply-demand risks in an uncertain future. There is also a brief discussion of model uncertainty and its implications for the results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Grey Zone Test Range Integrated Urban Simulation Environment

Sandia National Laboratories is part of the government test and evaluation team for the Defense Advanced Research Projects Agency Collection and Monitoring via Planning for Active Situational Scenarios program. The program is designed to better understand competition in the area between peace and conventional conflict when adversary actions are subtle and difficult to detect. For the purposes of test and evaluation, Sandia conducted a range of activities for the program: creation of the Grey Zone Test Range; design of the data stream for a user experiment conducted with U.S. Indo-Pacific Command; design, implementation, and execution of the formal evaluation; and analysis and summary of the evaluation results. This report details Sandia's activities and provides additional information on the Grey Zone Test Range urban simulation environment developed to evaluate the performer technologies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

42 ENGINEERING↗