Characterize the Demand and Energy Characteristics of Residential Electric Vehicle Supply Equipment

The EV Project enrolled over 8,000 residential participants. These participants purchased or leased a Nissan Leaf or Chevrolet Volt. The EV Project provided and installed Blink Electric Vehicle Supply Equipment (EVSE), used to recharge their PEV, in exchange for their agreement to allow project analysts to evaluate data collected from charging their PEV at their residence and away from home. The power required to recharge a PEV can be a significant contributor to the electrical load a residence places on the electric grid. What insight can The EV Project data provide in characterizing this contribution in terms of power demand and energy consumption to assist electric utilities in PEV adoption planning?

33 ADVANCED PROPULSION SYSTEMS↗

Considerations for Corridor and Community DC Fast Charging Complex System Design

The Idaho National Laboratory (INL), a U.S. Department of Energy (DOE) national laboratory located in Idaho Falls, Idaho, has been DOE’s lead laboratory for the field testing of light-duty plug-in electric vehicles (PEVs), charging infrastructure, and other alternative vehicle technologies for 25 years. INL has tested and collected data from more than 17,000 charging stations, documenting efficiencies, charge profiles, and PEV drivers’ behaviors when using charging infrastructure. Based on the experience of INL staff and support personnel, DOE requested that INL perform three tasks: • Identify pertinent lessons learned from previous direct current (DC) fast charger (DCFC) deployment and data collection activities in order to perform an analysis of the experience to date with DC fast charging systems • Establish the criteria for siting DC fast charging systems, including access to current or future sizeable penetrations of PEVs and existing power, the potential to be used by local (intracity) as well as pass-through (intercity) PEV drivers, expandability, and accessible to the federal highway system • Develop a draft system specification that lists the components that will be incorporated in a DC fast charging complexes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EV Charging Infrastructure Roadmap

As highlighted in the U.S. Department of Energy’s EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to “… produce plug-in electric vehicles that are as affordable and convenient for the average American family as today’s gasoline-powered vehicles …” [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumes that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge

33 ADVANCED PROPULSION SYSTEMS↗

Drive Electric Vermont Case Study

Currently in the United States, the heavy majority of plug-in electric vehicle (PEV) sales have been in highly conducive, selected, metropolitan areas; opposed to more broad distribution across the country. The U.S. Department of Energy’s EV Everywhere Grand Challenge is looking carefully at the barriers and opportunities that exist to enable small and midsize communities to partake in the PEV market and benefit from the economic and environmental advantages of PEVs. In order to gain insight into these challenges and barriers, DOE selected a success story (i.e., Drive Electric Vermont) as the subject of this case study, as the state of Vermont is tied with Detroit, Michigan in having the highest percentage of 2014 (most recent complete data) PEV registrations for cold weather U.S. cities and has seen more than a sixfold increase in charging stations over the last three years. The overall objective of this case study was to use the lessons learned from Drive Electric Vermont to determine what activities are most effective at encouraging acquisitions of PEVs and deployment of charging infrastructure in small to midsize communities, prioritizing and sequencing their implementation, identifying robust means for extrapolation, and applying this understanding to other small to midsize communities across the nation. The Drive Electric Vermont Program was formed in 2012 with a goal of increasing the use of electrified transportation in Vermont through policy development, education and outreach, and infrastructure development. The Drive Electric Vermont Program can be broadly broken into four components: (1) strategic planning/leadership, (2) stakeholder/partnership development, (3) education and outreach, and (4) incentives. The early phases of the program focused heavily on strategic planning, and stakeholder and partnership development, followed by a transition to education and outreach activities, charging infrastructure development, and grant and incentive programs that support charging infrastructure deployment and PEV purchases. Future plans include an additional round of consumer/dealer PEV incentives, continuation of the marketing campaign, and utilization of consumer surveys to develop new campaign themes and to optimize information distribution channels. In Vermont, the number of PEVs grew from 88 in July 2012 to 1,113 in January 2016, with a high percentage of the PEVs being plug-in hybrids (i.e., 865) versus all electric vehicles (i.e., 248). The most popular PEVs are Toyota’s Prius Plug-in and Ford’s C-Max Energi, which make up a combined 48% of the total PEV ownership in the state. The PEVs are predominantly clustered in four counties: Lamoille, Caledonia, Washington, and Chittenden. There is no evident correlation between community size and PEV penetration; however, over 70% of PEV owners are in communities of 1,000 to 10,000 people. On the other hand, there is a close correlation between where PEVs are registered and where they publically charge. The number of PEV charging stations in Vermont grew from 17 in January 2013 to 111 in January 2016, at a variety of charging venues, including retail, parking (short term and long term), workplace, dealerships, hotels, education, leisure, and hospitals. The vast majority of the charging venues contain Level 2 electric vehicle supply equipment (EVSE) solely or combined with Level 1 EVSE or direct current fast charging. The average power transferred per charging event for communities across Vermont ranged from 4.8 to 13.8 kWh for direct current fast charging and 1.0 to 11.9 kWh for and Level 2 EVSE. Over half the charging locations offer free charging. For those that do require payment, different pricing models are employed, including monthly memberships, hourly payment (where there is often a higher fee for the first hour followed by a lower hourly fee for the remaining hours), and energy use based on kWh drawn from the EVSE. There is no correlation between pricing models and community size and region, the strongest correlation is by network provider. Charging events across Vermont generally correlate with east-west bands of chargers (Figure ES-1) running from Burlington to Montpelier and in the area of Rutland.

33 ADVANCED PROPULSION SYSTEMS↗

Micro Climate Assessment of Grid-Connected Electric Drive Vehicles and Charging Infrastructure. Final Report

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s advanced vehicle testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America to conduct several U.S. Department of Defense-based micro-climate studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). The study included Joint Base Lewis McChord, located in Washington State; Naval Air Station Whidbey Island, located in Washington State; and United States Marine Corp Base Camp Lejeune, located in North Carolina. The project was divided into four tasks for each of the three bases studied. Task 1 consisted of surveying the non-tactical fleet of vehicles to begin review of vehicle mission assignments and types of vehicles in service. In Task 2, the daily operational characteristics of the vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. Results of the data analysis and observations were provided. Individual observations of these selected vehicles provided the basis for recommendations related to PEV adoption (i.e., whether a battery electric vehicle or plug-in hybrid electric vehicle [collectively referred to as PEVs] can fulfill the mission requirements). It also provided the basis for recommendations related to placement of PEV charging infrastructure. In Task 4, an implementation approach was provided for near-term adoption of PEVs into the respective fleets. Each facility was provided detailed reports on each of these tasks. This paper summarizes and provides observations on the project and completes Intertek’s required actions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What is the Controllable Electrical Demand from Non-Residential Electric Vehicle Supply Equipment in the San Diego Region?

The EVSE deployed by The EV Project included both residential and non-residential units. Approximately 4,000 non-residential AC Level 2 (ACL2) EVSE were installed in workplace environments, fleet applications and publicly accessible locations near retail centers, parking lots, and similar locations. The power required to recharge a plug-in electric vehicle (PEV) can be a significant additional electrical load to electric grid but may also provide a controllable resource for mitigating grid overload issues. Electric utilities seek ways to reduce their generating costs by controlling the maximum (peak) load on their system, their generating resources, and frequency and voltage control on the system. This management may be achieved indirectly, through rates that incentivize their customers (including PEV owners) to manage the charging of their vehicles, or may take the form of direct utility control of non-residential EVSE. What insight can The EV Project data provide related to the magnitude of this impact and the potential controllable demand? The paper What is the Controllable Electrical Demand from Residential EVSE in the San Diego Region?1 addressed this question for residential EVSE. This paper quantifies the total controllable electrical load imposed on the electric grid by non-residential PEV charging in the San Diego region of The EV Project.

33 ADVANCED PROPULSION SYSTEMS↗

Implementation Approach for Electric Vehicles at Marine Corps Base Camp Lejeune. Task 4

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (Intertek) to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). This study is focused on the Marine Corps Base Camp Lejeune (MCBCL) located in North Carolina. Task 1 consisted of a survey of the non-tactical fleet of vehicles at MCBCL to begin the review of vehicle mission assignments and types of vehicles in service. In Task 2, daily operational characteristics of vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. The results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption, i.e., whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. It also provided the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the MCBCL fleet. Intertek acknowledges the support of Idaho National Laboratory, Marine Corps headquarters, and Marine Corps Base Camp Lejeune fleet management and personnel for participation in this study. Intertek is pleased to provide this report and is encouraged by enthusiasm and support from MCBCL personnel.

33 ADVANCED PROPULSION SYSTEMS↗

Utilization Assessment of Target Electrification Vehicles at Marine Corps Base Camp Lejeune. Task 3

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (Intertek) to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at MCBCL to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 involved identifying daily operational characteristics of select vehicles and initiating data logging of vehicle movements in order to characterize the vehicle’s mission. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements and provide observations related to placement of PEV charging infrastructure. This report provides the results of the data analysis and observations related to replacement of current vehicles with PEVs. This fulfills part of the Task 3 requirements. Task 3 also includes an assessment of the charging infrastructure required to support this replacement, which is the subject of a separate report. Intertek acknowledges the support of Idaho National Laboratory, Marine Corps headquarters, and Marine Corps Base Camp Lejeune Fleet management and personnel for participation in this study. Intertek is pleased to provide this report and is encouraged by enthusiasm and support from MCBCL personnel.

33 ADVANCED PROPULSION SYSTEMS↗

Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Marine Corps Base Camp Lejeune. Task 3

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s advanced vehicle testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (Intertek) to conduct several U.S. Department of Defense-based studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at Marine Corps Base Camp Lejeune to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 selected vehicles for further monitoring and involved identifying daily operational characteristics of these select vehicles. Data logging of vehicle movements was initiated in order to characterize the vehicle’s mission. The Task 3 vehicle utilization report provided results of the data analysis and observations related to the replacement of current vehicles with PEVs. Finally, this report provides an assessment of charging infrastructure required to support the suggested PEV replacements. Intertek acknowledges the support of Idaho National Laboratory, Marine Corps headquarters, and Marine Corps Base Camp Lejeune Fleet management and personnel for participation in this study. Intertek is pleased to provide this report and is encouraged by enthusiasm and support from Marine Corps Base Camp Lejeune personnel.

33 ADVANCED PROPULSION SYSTEMS↗

Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles and charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of the vehicles and recharging decisions made. Data is reported for the use of more than 25,000 vehicles and charging units.

33 ADVANCED PROPULSION SYSTEMS↗

Characterize Plug-In Electric Vehicle Driver Away-From-Home Parking Behavior in The EV Project

The EV Project deployed over 5,000 AC Level 2 charging stations and over 100 dual-port DC fast chargers for commercial use in 17 geographic regions across the united States. Approximately 8,300 Nissan LEAFs™ and Chevrolet Volts PEVs participated in The EV Project by allowing data to be collected characterizing operation of their PEV and their charging usage. In the San Diego region, final PEV enrollment included 681 Leafs and 272 Volt owners. The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included electric vehicle supply equipment (EVSE) installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where The EV Project residential participants resided and where significant PEV traffic was expected. Using this process, The EV Project installed 545 non-residential fleet, workplace, and publicly accessible EVSE at 164 locations in the San Diego region. Another report: “Do PEV Drivers Park near Publicly Accessible EVSE in San Diego but not use them?” 1 investigated the San Diego PEV drivers’ use of 139 of these publicly accessible EVSE locations. It examined how frequently drivers parked near publicly accessible EVSE locations, but did not use them for charging. It concluded that parking near EVSE installed by The EV Project accounted for 3% of vehicle away-from-home parking. This report looks in greater detail at the PEV parking locations in San Diego to determine if there are highly utilized parking locations that should have EVSE available.

33 ADVANCED PROPULSION SYSTEMS↗

Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Naval Air Station Whidbey Island: Task 3

Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 selected vehicles for further monitoring and involved identifying daily operational characteristics of these select vehicles. Data logging of vehicle movements was initiated in order to characterize the vehicle’s mission. The Task 3 Vehicle Utilization report provided the results of the data analysis and observations related to the replacement of current vehicles with PEVs. This report provides an assessment of charging infrastructure required to support the suggested PEV replacements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study: Final Report

Collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization Study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report summarizes the fleets studied to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Preparedness - Implementation Approach for Electric Vehicles at Naval Air Station Whidbey Island. Task 4

Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). This study is focused on the Naval Air Station Whidbey Island (NASWI) located in Washington State. Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. In Task 2, daily operational characteristics of vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. The results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption, i.e., whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. It also provided the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the NASWI fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Characterize the Demand and Energy Characteristics of Direct Current Fast Chargers

The electric vehicle supply equipment (EVSE) deployed by The EV Project included both AC Level 2 (ACL2) and DCFC units. Over 100 of the Blink dual-port DCFCs were deployed by The EV Project. These DCFCs were all publicly accessible, located in workplaces, near traffic hubs, retail centers, parking lots, restaurants, and similar locations. The Blink DCFC dual-port design sequences the charge from one port to the other, delivering power to only one of two vehicles connected at a time. The actual power delivered through a port is determined by the PEV’s on-board battery management system (BMS).The Blink DCFC is capable of charging at power up to 60 kW. For the EV Project, the Nissan Leaf was the only participating PEV capable of accepting a DC charge. The Nissan Leaf BMS allows acceptance of up to 50 kW DC power. At this rate, the DCFC is capable of recharging a Leaf battery from a 30% state of charge (SOC) to an 80% SOC in about 25 minutes. The power required by the DCFC to recharge a plug-in electric vehicle (PEV) can be a significant additional electrical load for the charging site host and contributes to the overall power demand on the electric grid.

33 ADVANCED PROPULSION SYSTEMS↗

Best Practices Utilized by The EV Project for Non-Residential Alternating Current Level 2 ?Electric Vehicle Supply Equipment Infrastructure Planning

The lack of public charging infrastructure for plug-in electric vehicles (PEVs) has been identified as a barrier to their widespread adoption. Federal and state grants have been awarded to promote public charging and encourage retail businesses to install charging infrastructure. A common question for charger installations is, “Where should the chargers be placed?” One of the objectives of the EV Project was to study the interaction of PEV drivers with the public infrastructure, so The EV Project attempted to develop a method to determine where EVSE should be placed. In the early stages of PEV sales in local markets, the options for siting publicly accessible EVSE were: • Plan locations associated with key attraction sites where PEV parking is anticipated • Directly solicit retail and public charging hosts for widespread placement • Ask the PEV drivers who were early adopters where they want public infrastructure • Identify sites near known high traffic areas

33 ADVANCED PROPULSION SYSTEMS↗

Are Plug-In Electric Vehicle Driver Preferences an Effective Method for Siting Publicly Accessible Electric Vehicle Supply Equipment?

The lack of public charging infrastructure for PEVs has been identified as a barrier to their widespread adoption. Federal and state grants have been awarded to promote public charging infrastructure and retail businesses have shown interest in installing charging infrastructure. A common question for Electric Vehicle Service Providers (EVSP) is, “Where should the chargers be placed?”

33 ADVANCED PROPULSION SYSTEMS↗

What Were the Driving and Charging Behaviors of High Mileage Accumulators?

During The EV Project, data was collected from approximately 8,000 Nissan Leaf and Chevrolet Volts that together accumulated over 124 million miles while generating data. There were significant differences in the technologies employed by the two primary vehicles in The EV Project; Nissan Leaf, and Chevrolet Volt. Because the Volt has an on-board range extending internal combustion engine (ICE) to recharge the battery while driving (extended range mode), the vehicle could be driven much further between charges. The Leaf’s range is limited by the battery capacity, but unlike the Volt can be “fast-charged” providing an opportunity to extend its daily travel distance. Many Plug-In Electric Vehicle (PEV) drivers in The EV Project accumulated miles at rates similar to what one would expect from an ICE vehicle. This paper examines some of the driving and charging characteristics of those PEV drivers who accumulated the most miles on their vehicles.