Felish, Aaron M.

Publications and source records attributed to Felish, Aaron M..

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Legacy Site 377 (Former Building 377) Soil Sampling and Analysis Plan Addendum 1 (April 2023)

The purpose of this addendum is to address data gaps identified in the Legacy Site 377 (Former Building 377) Soil Sampling and Analysis Plan (SAP) (LLNL-AM-826971) (LLNL 2021a) and the Phase II Site Assessment Report for Legacy Slab 377 (LLNL-TM-828194) (LLNL 2021b). This addendum will be used in conjunction with the 2021 SAP. All policies and procedures set forth in the SAP that are not modified in this addendum will remain in effect for the duration of the project, where applicable.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Water Line - Zone 3 In Fill Assessment Soil Sampling and Analysis Plan (Addendum 1, March 2023)

The purpose of this addendum is to expand the Site 300 Water Line Project – Zone 3 In Fill Assessment Soil Sampling and Analysis Plan (SAP), (LLNL-AM-826971), dated August 2021. This addendum will be used in conjunction with the SAP. All policies and procedures set forth in the SAP that are not modified in this addendum will remain in effect for the duration of the project, where applicable.

54 ENVIRONMENTAL SCIENCES↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗