Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Obtaining cryogenic molecular transport data for analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA.

James Webb Space Telescope, contamination, cleanro↗

Predicting contamination accumulation in facilities with limited data

In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors turned out to be much cleaner than what was predicted.

James Webb Space Telescope, contamination, cleanro↗