Engineering PapersSearch

Engineering topics

Evans, Jordan P.

Publications and source records attributed to Evans, Jordan P..

Managing the Mars Science Laboratory Thermal Vacuum Test for Safety and Success

The Mars Science Laboratory is a NASA/JPL mission to send the next generation of rover to Mars. Originally slated for launch in 2009, development problems led to a delay in the project until the next launch opportunity in 2011. Amidst the delay process, the Launch/Cruise Solar Thermal Vacuum Test was undertaken as risk reduction for the project. With varying maturity and capabilities of the flight and ground systems, undertaking the test in a safe manner presented many challenges. This paper describes the technical and management challenges and the actions undertaken that led to the ultimate safe and successful execution of the test.

Evans, Jordan P.

Engineering the LISA Project: Systems Engineering Challenges

The Laser Interferometer Space Antenna (LISA) is a joint NASA/ESA mission to detect and measure gravitational waves with periods from 1 s to 10000 s. The systems engineering challenges of developing a giant interferometer, 5 million kilometers on a side, an: numerous. Some of the key challenges are presented in this paper. The organizational challenges imposed by sharing the engineering function between three centers (ESA ESTEC, NASA GSFC, and JPL) across nine time zones are addressed. The issues and approaches to allocation of the acceleration noise and measurement sensitivity budget terms across a traditionally decomposed system are discussed. Additionally, using LISA to detect gravitational waves for the first time presents significant data analysis challenges, many of which drive the project system design. The approach to understanding the implications of science data analysis on the system is also addressed.

systems engineering

Plan for compensation of self-gravity on ST-7/DRS

The Space Technology 7 (ST-7) payload, flying on the Laser Interferometer Space Antenna (LISA) Pathfinder (LPF) mission, will demonstrate drag-free control of a test mass with acceleration disturbances below 3x10-14 m/s2/(square root)Hz. Low frequency acceleration noise introduced by the electrostatic force needed to counter static mass distribution imbalance is expected to be a significant contributor to the acceleration noise budget. For this reason, the self-gravity (due to mass imbalance) is minimized by adding trim mass to bring the total differential acceleration between the two test masses due to self-gravity below 5x10-10 m/s2 in any axis and the DC acceleration gradient due to self-gravity below 4x10-8 m/s2/m in any axis of either test mass. A plan has been established to develop the distribution and placement of the compensation masses. Compensation for the self-gravity effects on the two test masses is handled in a two step process. A nominal compensation mass is defined and incorporated early and is located very near the test masses. The final trimming for self-gravity occurs after the integration on the spacecraft with small mass added externally to the test mass vacuum enclosures. The plan identifies three preliminary points in the hardware maturity where the trimming to the as-built configuration can take place: (1) during build-up of the sensor vacuum enclosure, (2) prior to delivery of the integrated ST-7 to Europe, and (3) prior to environmental testing of the integrated LPF system. The sensitivity of the self-gravity to knowledge errors in the actual mass distribution is taken into account in the determination of final trimming opportunities and mounting locations.

acceleration noise