Engineering Papers⌕ Search

Engineering topics

England, A C

Publications and source records attributed to England, A C.

Overview of KSTAR initial operation

Since the successful first plasma generation in the middle of 2008, three experimental campaigns were successfully made for the KSTAR device, accompanied with a necessary upgrade in the power supply, heating, wall-conditioning and diagnostic systems. KSTAR was operated with the toroidal magnetic field up to 3.6 T and the circular and shaped plasmas with current up to 700 kA and pulse length of 7 s, have been achieved with limited capacity of PF magnet power supplies. The mission of the KSTAR experimental program is to achieve steady-state operations with high performance plasmas relevant to ITER and future reactors. The first phase (2008-2012) of operation of KSTAR is dedicated to the development of operational capabilities for a super-conducting device with relatively short pulse. Development of start-up scenario for a super-conducting tokamak and the understanding of magnetic field errors on start-up are one of the important issues to be resolved. Some specific operation techniques for a super-conducting device are also developed and tested. The second harmonic pre-ionization with 84 and 110 GHz gyrotrons is an example. Various parameters have been scanned to optimize the pre-ionization. Another example is the ICRF wall conditioning (ICWC), which was routinely applied during the shot to shot interval. The plasma operation window has been extended in terms of plasma beta and stability boundary. The achievement of high confinement mode was made in the last campaign with the first neutral beam injector and good wall conditioning. Plasma control has been applied in shape and position control and now a preliminary kinetic control scheme is being applied including plasma current and density. Advanced control schemes will be developed and tested in future operations including active profiles, heating and current drives and control coil-driven magnetic perturbation.

Kwon, M↗

Second Harmonic Breakdown in KSTAR

An 84-GHz electron cyclotron heating (ECH) system is being installed on the KSTAR tokamak. KSTAR adopts ECH-assisted start-up for the flexibility and reliability of the KSTAR operation with the plasma breakdown voltage reduced. The available maximum power of the 84 GHz ECH system is presently 500 kW with maximum duration of 2 s. Currently, the second harmonic ECH-assisted start-up is under consideration because a low toroidal field of B{sub T}{approx}1.5 T is desirable for safety and also for the high-beta experiments in the initial operation phase. The studies in this paper are on the effectiveness of the second harmonic breakdown using a 0-D time dependent plasma evolution code and the comparison with the recent DIII-D experimental results on the second harmonic pre-ionization.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗