Engineering Papers⌕ Search

Engineering topics

Eldred, Jeffrey

Publications and source records attributed to Eldred, Jeffrey.

At least 19 records

Preliminary results of the 2023 International Fermilab Booster Studies

Here, an overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields corresponding to the injection energy. The beam loss and emittance growth were observed under varying intensity, tunes, and sextupole resonances. The corresponding beam conditions were also simulated with the MADX-SC code [1]. In the second study, measurements of the vertical half-integer resonance and correction methods are conducted for high-intensity beams ramping in the Booster. Finally, syncho-betatron instabilities are observed during transition-crossing in the Booster under strong space-charge conditions.

43 PARTICLE ACCELERATORS↗

ACE Science Workshop Report

We summarize the Fermilab Accelerator Complex Evolution (ACE) Science Workshop, held on June 14-15, 2023. The workshop presented the strategy for the ACE program in two phases: ACE Main Injector Ramp and Target (MIRT) upgrade and ACE Booster Replacement (BR) upgrade. Four plenary sessions covered the primary experimental physics thrusts: Muon Collider, Neutrinos, Charged Lepton Flavor Violation, and Dark Sectors. Additional physics and technology ideas were presented from the community that could expand or augment the ACE science program. Given the physics framing, a parallel session at the workshop was dedicated to discussing priorities for accelerator R&D. Finally, physics discussion sessions concluded the workshop where experts from the different experimental physics thrusts were brought together to begin understanding the synergies between the different physics drivers and technologies. In December of 2023, the P5 report was released setting the physics priorities for the field in the next decade and beyond, and identified ACE as an important component of the future US accelerator-based program. Given the presentations and discussions at the ACE Science Workshop and the findings of the P5 report, we lay out the topics for study to determine the physics priorities and design goals of the Fermilab ACE project in the near-term.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design Considerations for Fermilab Multi-MW Proton Facility in the DUNE/LBNF era

Fermilab has submitted two Snowmass whitepapers on a future 2.4~MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between these two scenarios, emphasizing the commonalities and tracing the differences to their original design questions. In addition to a high-level summary of the two 2.4~MW upgrade scenarios, there is a brief discussion of staging, beamline capabilities, subsequent upgrades, and relevant R&D. We are proposing a vigorous program to address various challenges associated with each scenario and to down-select the concept, most suitable to provide proton beams for years to come.

43 PARTICLE ACCELERATORS↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Averaged invariants in storage rings with synchrotron motion

In an ideal accelerator, the single-particle dynamics can be decoupled into transverse motion—the betatron oscillations— and longitudinal motion—the synchrotron oscillations. Chromatic and dispersive effects introduce a coupling between these dynamics, the so-called synchro-betatron coupling. We present an analysis of the fully coupled dynamics over a single synchrotron oscillation that leads to an averaged invariant with synchro-betatron coupling in a generic lattice. Here, we apply this analysis to two problems: first, a toy lattice where the computations are analytically tractable, then a design for a rapid cycling synchrotron built using the integrable optics described by Danilov and Nagaitsev, showing that although there is fairly complex behavior over the course of a synchrotron oscillation, the Danilov-Nagaitsev invariants are nevertheless periodic with the synchrotron motion.

43 PARTICLE ACCELERATORS↗

Physics Studies for High Intensity Proton Beams at the Fermilab Booster

We present the results of the studies of the physics of high intensity proton seams at the 8 GeV Fermilab Booster RCS carried out in Spring 2019. The Booster studies span a variety of beam physics topics - The discovery of a new convective beam instability, an investigation of power-supply ripple in the Booster gradient dipoles, a characterization of space-charge induced emittance growth, optimization of adiabatic capture, a study of periodicity in the Booster, nonlinear chromaticity measurements, and transverse impedance measurements. The results will help prepare the Booster for the upcoming PIP-II intensity upgrades and inform next-generation RCS design.

43 PARTICLE ACCELERATORS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchmark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

The Integrable Optics Test Accelerator

The Integrable Optics Test Accelerator (IOTA) at the Fermilab Accelerator Science & Technology (FAST) Facility is beginning operations, with an experimental program aimed at developing technology to enable future high intensity particle beams. The results garnered from IOTA should allow for better control of beam losses, leading to higher safely achievable beam power. This will be particularly useful for future accelerator based neutrino experiments. Two of the R&D efforts at IOTA, Nonlinear Integrable Optics and Electron Column-based space charge compensation, are discussed here.

43 PARTICLE ACCELERATORS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchm ark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

Effects of Synchrotron Motion on Nonlinear Integrable Optics

An integrable Rapid-Cycling Synchrotron (iRCS) has been proposed as a replacement for the Fermilab Booster to achieve multi-MW beam power for the Fermilab high-energy neutrino program.* The successful application of nonlinear integrable optics to proton synchrotrons requires careful examination of single-particle longitudinal effects, especially synchrotron motion. For example, synchrobetatron coupling may excite transverse resonances in the ring. We will use the Synergia code to simulate the effects of this synchrobetatron coupling on the iRCS design with nonlinear inserts. Our goal will be to identify new invariants in the presence of this coupling. Assuming the synchrotron tune is sufficiently small, we have identified one or more adiabatic invariants of the motion. These invariants suggest that integrable optics with synchrobetatron coupling retains integrability when averaged over a synchrotron period.

43 PARTICLE ACCELERATORS↗

Simulation of Integrable Synchrotron with Space-charge and Chromatic Tune-shifts

We present a nonlinear rapid-cycling synchrotron designed as a high-intensity replacement of the Fermilab Booster. The design incorporates integrable optics, an innovation in particle accelerator design that enables strong nonlinear focusing without generating parametric resonances. We use the Synergia space-charge tracking code to demonstrate the stability of a beam in this lattice with a space-charge tune-shift up to 0.4 and a rms momentum spread up to 0.4\%. We demonstrate the benefit of increased lattice periodicity.

43 PARTICLE ACCELERATORS↗

RCS for Multi-MW Facility at Fermilab [PowerPoint]

DUNE/LBNF is an international multi-decadal physics program for leading-edge neutrino science and proton decay study. The DUNE Interim Design Report calls the completion of PIP-II by 2026 and an upgrade to 2.4 MW beam power at 120 GeV by 2032. We argue a new rapid-cycling synchrotron (RCS) will enable the proton facility to achieve 2.4 MW beam power and set the stage for further upgrades to facility power. We discuss the constraints on RCS design and the implications for other parts of the accelerator facility.

43 PARTICLE ACCELERATORS↗

Beam Tests of Diamond-Like Carbon Coating for Mitigation of Electron Cloud

Electron cloud beam instabilities are an important consideration in virtually all high-energy particle accelerators and could pose a formidable challenge to forthcoming high-intensity accelerator upgrades. Our results evaluate the efficacy of a diamond-like carbon (DLC) coating for the mitigation of electron in the Fermilab Main Injector. The interior surface of the beampipe conditions in response to electron bombardment from the electron cloud and we track the change in electron cloud flux over time in the DLC coated beampipe and uncoated stainless steel beampipe. The electron flux is measured by retarding field analyzers placed in a field-free region of the Main Injector. We find the DLC coating reduces the electron cloud signal to roughly 2\% of that measured in the uncoated stainless steel beampipe.

43 PARTICLE ACCELERATORS↗