Engineering Papers⌕ Search

Engineering topics

Edstrom, D.

Publications and source records attributed to Edstrom, D..

Status of the IOTA Proton Injector

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of 2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗

IOTA Proton Injector Beamline Installation

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗