Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Constructor selection research

The process of space construction is defined by the construction goal and by the construction system selected to accomplish that goal. The former provides the tasks that must be executed, while the latter provides the capabilities to execute them. This presentation outlines a high-level model of space construction and illustrates the relationship between constructor and task. The construction model is then utilized to develop a preliminary theory of constructor selection. The need for broad models of construction, constructor selection, and constructor management is identified. From this preliminary work it can be concluded that task decomposition is dependent upon both task and constructor; the selection process is separable from the optimization process; and that logical, defensible selection is possible.

Helleckson, Brent↗