The SuperB Project: Accelerator Status and R&D

The SuperB collider project has been recently approved by the Italian Government as part of the National Research Plan. SuperB is a high luminosity (10{sup 36} cm{sup -2} s{sup -1}) asymmetric e{sup +}e{sup -} collider at the {Upsilon}(4S) energy. The design is based on a 'large Piwinski angle and Crab Waist' scheme already successfully tested at the DAPHNE {Phi}-Factory in Frascati, Italy. The project combines the challenges of high luminosity colliders and state-of-the-art synchrotron light sources, such as two beams (e{sup +} at 6.7, HER, and e{sup -} at 4.2 GeV, LER) with extremely low emittances and small beam sizes at the Interaction Point. As unique features, the electron beam will be longitudinally polarized at the IP and the rings will be able to ramp down to collide at the {tau}/charm energy threshold with a luminosity of 10{sup 35} cm{sup -2} s{sup -1}. The relatively low beam currents (about 2 A) will allow for low running (power) costs compared to similar machines. The insertion of beam lines for synchrotron radiation (SR) users is the latest feature included in the design. The lattice has been recently modified to accommodate insertion devices for X-rays production.

43 PARTICLE ACCELERATORS↗

Results From the DAFNE High Luminosity Test

The DAPHNE collider, based on a new collision scheme including Large Piwinsky angle and Crab-Waist, has been successfully commissioned and is presently delivering luminosity to the SIDDHARTA detector. Large crossing angle and Crab-Waist scheme proved to be effective in: (1) Increasing luminosity, now a factor 2.7 higher than in the past; and (2) controlling transverse beam blow-up due to the beam-beam. Work is in progress to reach the ultimate design luminosity goal 5.0 {center_dot} 10{sup 32} cm{sup -2}s{sup -1}. The new collision scheme is the main design concept for a new project aimed at building a Super-B factory that is expected to achieve a luminosity of the order of 10{sup 36} cm{sup -2} s{sup -1} and it has been also taken into account to upgrade one of the LHC interaction regions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Crab Waist Collision at DAFNE

DAFNE is an accelerator complex consisting of a double ring lepton collider working at the c.m. energy of the {Phi}-resonance (1.02 GeV) and an injection system. In its original configuration the collider consisted of two independent rings, each {approx}97 m long, sharing two 10 m long interaction regions (IR1 and IR2) where the KLOE and FINUDA or DEAR detectors were respectively installed. A full energy injection system, including an S-band linac, 180 m long transfer lines and an accumulator/damping ring, provides fast and high efficiency electron positron injection also in topping-up mode during collisions. Recently the DAFNE collider has been upgraded in order to implement a new collision scheme based on large Piwinski angle and cancellation of the synchro-betatron resonances by means of electromagnetic sextupoles (Crab-Waist compensation). The novel approach has proved to be effective in improving beam-beam interaction and collider luminosity.

43 PARTICLE ACCELERATORS↗

DAFNE Status Report

DAFNE, the Frascati {Phi}-factory, is providing an increasing peak and integrated luminosity for the KLOE experiment. Such improvements, together with a background reduction in the KLOE detector, have been obtained after continuous machine studies. An increase of the single bunch luminosity has been achieved essentially by the reduction of the effects of machine non-linearities. The integrated luminosity was improved by the capability of topping up the beam currents while keeping the KLOE detector on, together with an increase of the stored currents.

43 PARTICLE ACCELERATORS↗

The SuperB Accelerator: Overview and Lattice Studies

SuperB aims at the construction of a very high luminosity (10{sup 36} cm{sup -2} s{sup -1}) asymmetric e{sup +}e{sup -} Flavour Factory, with possible location at the campus of the University of Rome Tor Vergata, near the INFN Frascati National Laboratory. In this paper the basic principles of the design and details on the lattice are given. SuperB is a new machine that can exploit novel very promising design approaches: (1) large Piwinski angle scheme will allow for peak luminosity of the order of 10{sup 36} cm{sup -2} s{sup -1}, well beyond the current state-of-the-art, without a significant increase in beam currents or shorter bunch lengths; (2) 'crab waist' sextupoles will be used for suppression of dangerous resonances; (3) the low beam currents design presents reduced detector and background problems, and affordable operating costs; (4) a polarized electron beam can produce polarized {tau} leptons, opening an entirely new realm of exploration in lepton flavor physics. SuperB studies are already proving useful to the accelerator and particle physics communities. The principle of operation is being tested at DAFNE. The baseline lattice, based on the reuse of all PEP-II hardware, fits in the Tor Vergata University campus site, near Frascati. A CDR is being reviewed by an International Review Committee, chaired by J. Dainton (UK). A Technical Design Report will be prepared to be ready by beginning of 2010.

43 PARTICLE ACCELERATORS↗

Crabbed Waist Collisions in DAFNE and Super-B Design

The new idea of increasing the luminosity of a collider with crab waist collisions and first experimental results from the DA{Phi}NE {Phi}-Factory at LNF, Frascati, using this concept are presented. Consequences for the design of future factories will be discussed. An outlook to the performance reach with crab waist collisions is given, with emphasis on future B Factories.

43 PARTICLE ACCELERATORS↗

Commissioning of the IGp Feedback System at DAFNE

The iGp (Integrated Gigasample Processor) is an innovative digital bunch-by-bunch feedback system developed by a KEK / SLAC / INFN-LNF joint collaboration. The processing unit can sample at 500 MHz and compute the bunch-by-bunch output signal for up to {approx}5000 bunches. The feedback gateware code is implemented inside just one FPGA (Field Programmable Gate Array) chip, a Xilinx Virtex-II. The FPGA implements two banks of 16-tap FIR (Finite Impulse Response) filters. Each filter is realtime programmable through the operator interface. At DA{Phi}NE, the Frascati {Phi}-Factory, two iGp units have been commissioned in the April 2007. The iGp systems have substituted the previous betatron feedback systems. This insertion has been very fast and has shown no problems involving just a substitution of the old, less flexible, digital systems, letting unchanged the baseband analog frontend and backend. The commissioning has been very simple, due to the complete and powerful EPICS operator interface, working well in local and remote operations. The software includes also tools for analyzing post processor data. A description of the commissioning with the operations done is reported.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design of a 10**36 CM-2 S-1 Super-B Factory

Parameters have been studied for a high luminosity e{sup +}e{sup -} collider operating at the Upsilon 4S that would deliver a luminosity of 1 to 4 x 10{sup 36}/cm{sup 2}/s. This collider, called a Super-B Factory, would use a combination of linear collider and storage ring techniques. In this scheme an electron beam and a positron beam are stored in low-emittance damping rings similar to those designed for a Linear Collider (LC) or the next generation light source. A LC style interaction region is included in the ring to produce sub-millimeter vertical beta functions at the collision point. A large crossing angle (+/- 24 mrad) is used at the collision point to allow beam separation. A crab-waist scheme is used to reduce the hourglass effect and restore peak luminosity. Beam currents of 1.8 A at 4 x 7 GeV in 1251 bunches can produce a luminosity of 10{sup 36}/cm{sup 2}/s with upgrade possibilities. Such a collider would produce an integrated luminosity of about 10,000 fb{sup -1} (10 ab{sup -1}) in a running year (10{sup 7} sec) at the {gamma}(4S) resonance. Further possibilities include having longitudinally polarized e- at the IR and operating at the J/Psi and Psi beam energies.

43 PARTICLE ACCELERATORS↗

DAFNE Setup And Operation With the Crab-Waist Collision Scheme

In the second half of 2007 a major upgrade has been implemented on the Frascati DA{Phi}NE collider in order to test the novel idea of Crab-Waist collisions. New vacuum chambers and permanent quadrupole magnets have been designed, built and installed to realize the new configuration. At the same time the performances of relevant hardware components, such as fast injection kickers and shielded bellows have been improved relying on new design concepts. The collider has been successfully commissioned in this new configuration. The paper describes several experimental results about linear and non-linear optics setup and optimization, damping of beam-beam instabilities and discusses the obtained luminosity performances. DA{Phi}NE [1] is the Frascati lepton collider working at the c m. energy of the {Phi} meson resonance (1020). It came in operation in 2001 and till summer 2007 provided luminosity, in sequence, to three different experiments which logged a total integrated luminosity of {approx} 4.4 fb{sup -1}. During these years the collider reached its best performances in terms of luminosity and background (L{sub peak} = 1.6 x 10{sup 32} cm{sup -2}s{sup -1} L{sub day} {approx} 10 pb{sup -1}) by means of several successive upgrades, relying on the experience gathered during the collider operations and implemented exploiting the shutdowns required for the experiment change over [2, 3, 4].

43 PARTICLE ACCELERATORS↗

The Super-B Project Accelerator Status

The SuperB project is an international effort aiming at building in Italy a very high luminosity e{sup +}e{sup -} (10{sup 36} cm{sup -2} sec{sup -1}) asymmetric collider at the Y(4S) energy in the CM. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of 'crab waist' sextupoles already successfully tested at the DA{Phi}NE {Phi}-Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper. The SuperB collider can reach a peak luminosity of 10{sup 36} cm{sup -2} sec{sup -1} with beam currents and bunch lengths similar to those of the past and present e{sup +}e{sup -} Factories, through the use of smaller emittances and new scheme of crossing angle collision. The beams are stored in two rings at 6.7 GeV (HER) and 4.2 GeV (LER). Unique features of the project are the polarization of the electron beam in the LER and the possibility to decrease the energies for running at the {tau}/charm threshold. The option to reuse the PEP-II B-Factory (SLAC) hardware will allow reducing costs. The SuperB facility will require a big complex of civil infrastructure. The main construction, which will house the final part of the LINAC, the injection lines, the damping rings, and the storage rings, will be mainly underground. Two sites have been considered: the campus of Tor Vergata University near Frascati, and the INFN Frascati Laboratory. No decision has been made yet. A footprint of the possible SuperB layout on the LNF area is shown in Fig. 1.

43 PARTICLE ACCELERATORS↗

SuperB Bunch-By-Bunch Feedback R&D

The SuperB project has the goal to build in Italy, in the Frascati or Tor Vergata area, an asymmetric e{sup +}/e{sup -} Super Flavor Factory to achieve a peak luminosity > 10**36 cm{sup -2} s{sup -1}. The SuperB design is based on collisions with extremely low vertical emittance beams and high beam currents. A source of emittance growth comes from the bunch by bunch feedback systems producing high power correction signals to damp the beams. To limit any undesirable effect, a large R&D program is in progress, partially funded by the INFN Fifth National Scientific Committee through the SFEED (SuperB Feedback) project approved within the 2010 budget. The SuperB project [1] has the goal to build in Italy, in the Frascati or Tor Vergata area, an asymmetric e{sup +}/e{sup -} Super Flavor Factory to achieve a peak luminosity > 10**36 cm{sup -2} s{sup -1}. In the last and current years, the machine layout has been deeply modified, in particular the main rings are now shorter and an option with high currents has been foreseen. In the fig.1 the new SuperB layout is shown. From bunch-by-bunch feedback point of view, the simultaneous presence in the machine parameters, of very low emittance, of the order of 5-10 pm in the vertical plane, and very high currents, at level of 4 Ampere for the Low Energy Ring, asks for designing very carefully the bunch-by-bunch feedback systems. The parameter list is presented in Fig. 2. The bunch-by-bunch feedback design must take care of the risky and exciting challenges proposed in the SuperB specifications, but it should consider also some other important aspects: flexibility in terms of being able to cope to unexpected beam behaviours [2], [3] legacy of previous version experience [4], [5] and internal powerful diagnostics [6] as in the systems previously used in PEP-II and DAFNE [7].

43 PARTICLE ACCELERATORS↗

Super-B Project Overview

The SuperB project aims at the construction of an asymmetric very high luminosity B-Factory on the Frascati/Tor Vergata (Italy) area, providing a uniquely sensitive probe of New Physics in the flavour sector of the Standard Model. The luminosity goal of 10{sup 36} cm{sup -2} s{sup -1} can be reached with a new collision scheme with 'large Piwinski angle' (LPA) and the use of 'crab waist sextupoles' (CW). A LPA&CW Interaction Region (IR) has been successfully tested at the DA{Phi}NE {Phi}-Factory at LNF-Frascati in 2008. The LPA&CW scheme, together with very low {beta}*, will allow for operation with relatively low beam currents and reasonable bunch length, comparable to those of PEP-II and KEKB. In the High Energy Ring (HER), two spin rotators will bring longitudinally polarized beams into collision at the IP. The lattice has been designed with a very low intrinsic emittance and is quite compact, less than 2 km long. The tight focusing requires the final doublet quadrupoles to be very close to the IP and very compact. A Conceptual Design Report was published in March 2007, and beam dynamics and collective effects R&D studies are in progress in order to publish a Technical Design Report by the end of 2010.

43 PARTICLE ACCELERATORS↗