Engineering Papers⌕ Search

Engineering topics

Douglas, D.

Publications and source records attributed to Douglas, D..

44 records · Page 3

Transmission of Megawatt Relativistic Electron Beams through Millimeter Apertures

High power, relativistic electron beams from energy recovery linacs have great potential to realize new experimental paradigms for pioneering research in fundamental and applied research. A major design consideration for these new generation of experimental capabilities is the understanding of the halo associated with these bright, intense beams. In this Letter, we report on measurements performed using the 100 MeV, 430 kWatt CW electron beam from the energy recovery linac at the Jeff erson Laboratory's Free Electron Laser facility as it traversed a set of small apertures in a 127 mm long aluminum block. Thermal measurements of the block together with neutron measurements near the beam-target interaction point yielded a consistent understanding of the beam losses. These were determined to be 3 ppm through a 2 mm diameter aperture and were maintained during a 7 hour continuous run.

43 PARTICLE ACCELERATORS↗

Advance in MEIC cooling studies

Cooling of ion beams is essential for achieving a high luminosity for MEIC at Jefferson Lab. In this paper, we present the design concept of the electron cooling system for MEIC. In the design, two facilities are required for supporting a multi-staged cooling scheme; one is a 2 MeV DC cooler in the ion pre-booster; the other is a high electron energy (up to 55 MeV) ERL-circulator cooler in the collider ring. The simulation studies of beam dynamics in an ERL-circulator cooler are summarized and followed by a report on technology development for this cooler. We also discuss two proposed experiments for demonstrating high energy cooling with a bunched electron beam and the ERL-circulator cooler.

43 PARTICLE ACCELERATORS↗

Optical Synchrotron Radiation Beam Imaging with a Digital Mask

We have applied a new imaging/optical masking technique, which employs a digital micro-mirror device (DMD) and optical synchrotron radiation (OSR), to perform high dynamic range (DR) beam imaging at the JLAB Energy Recovery Linac and the SLAC/SPEAR3 Synchrotron Light Source. The OSR from the beam is first focused onto the DMD to produce a primary image; selected areas of this image are spatially filtered by controlling the state of individual micro-mirrors; and finally, the filtered image is refocused onto a CCD camera. At JLAB this technique has been used successfully to view the beam halo with a DR ~ 105. At SPEAR3 the DMD was used to filter out the bright core of the stored beam to study the turn-by-turn dynamics of the 10-3 weaker injected beam. We describe the optical performance, present limitations and our plans to improve the DR of both experimental systems.

43 PARTICLE ACCELERATORS↗

Biomass accumulation in hydroponically grown sweetpotato in a controlled environment: a preliminary study

In the development of a plant growth model, the assumptions made and the general equations representing an understanding of plant growth are gradually refined as more information is acquired through experimentation. One such experiment that contributed to sweetpotato model development consisted of measuring biomass accumulation of sweetpotato grown in hydroponic culture in a plant growth chamber. Plants were started from fifteen centimeter long 'TU-82-155' sweetpotato vine cuttings spaced 25 cm apart in each of 18 rectangular growing channels (0.15 by 0.15 by 1.2m) in a system designed to use the nutrient film technique (NFT). Each channel contained four plants. The 3.5m by 5.2m plant growth chamber environmental parameters included an 18h photoperiod, 500 micromoles m-2 s-1 of photosynthetic photon flux (PPF), and a diurnal light/dark temperature of 28 degrees C/22 degrees C. The relative humidity was 80 +/- 5% and the CO2 partial pressure was ambient (350 ppm). The nutrient solution contained in 30L reservoirs was a modified half Hoagland's solution with a 1:2.4 N:K ratio and a pH of 6.2. Solution replenishment occurred when the electrical conductivity (EC) level dropped below 1050. Plants were harvested at 15 days after planting (DAP) and weekly thereafter until day 134. By 57 DAP, stems and fibrous roots had acquired 90% of their total dry biomass, while leaves had reached 84% of their maximum dry biomass. Beginning at 64 DAP dry biomass accumulation in the storage roots dominated the increase in dry biomass for the plants. Dry weight of storage roots at 120 DAP was 165 g/plant or 1.1 kg/m2. Resulting growth curves were consistent with the physiological processes occurring in the plant. Results from this study will be incorporated in a plant growth model for use in conjunction with controlled life support systems for long-term manned space missions.

Biomass↗