Improvements to the Blade Element Momentum Formulation of OpenFAST for Skewed Inflows

In this work, we modify the blade element momentum algorithm of OpenFAST to improve its predictions under large skewed inflow conditions. We use the well-known Glauert's skew correction and introduce continuous extension of the model for high-thrust conditions. We present the rationale behind Glauert's empirical model and discuss the different conventions possible for the axial induction factor. We verify the model against the higher-fidelity lifting-line vortex method and blade-resolved computational fluid dynamics, and we observe that the new implementation enhances the accuracy and reliability of OpenFAST's aerodynamic modeling capabilities in conditions involving large skew angles. For the parametric studies run using the different codes, we find that the power changes with the skew angle as cos 1.7 (θ skew ) and the thrust as cos 0.65 (θ skew ). An analysis of the azimuthal variation of the induced velocities in the rotor plane reveals that current redistribution models used in blade element momentum codes may need to be refined.

17 WIND ENERGY↗

A generalized wind turbine cross section as a reduced-order model to gain insights in blade aeroelastic challenges

In this work, we present an approach to study the aeroelastic stability of a wind turbine by focusing on the dynamics of a blade cross section. We present a methodology to obtain a reduced-order model of the blade dynamics in the form of generalized cross-sectional quantities that approximates the aerodynamic and structural properties of the full blade. The motivation for the work is to gain a physical understanding of the influence of aerodynamic models such as dynamic wake and dynamic stall on the frequency and damping of the structure using a reduced-order model with low computational cost. The model may be coupled to two-dimensional computational fluid dynamics softwares or engineering unsteady airfoil aerodynamics models accounting for dynamic wake and dynamic stall. In the latter case, we can obtain monolithic state-space forms of the aeroelastic system of equations, which simplifies the determination of the modal parameters and therefore the study of stability. The work investigates wind turbines in operation or at standstill, where vortex-induced vibrations and stall-induced vibrations, respectively, might be an issue. The implementation is made available as part of the open-source Python package WELIB and as part of the open-source unsteady aerodynamic driver of OpenFAST.

17 WIND ENERGY↗

Dynamic inflow and unsteady aerodynamics models for modal and stability analyses in OpenFAST

This work presents two aerodynamic models that are used to perform modal and stability analyses of wind turbines. Including aerodynamic effects in stability analyses is important to capture aerodynamic inertia, stiffness, and damping. The two models consist of a dynamic inflow model based on Øye’s model and an unsteady aerodynamics model based on a simplified Beddoes-Leishman dynamic stall model. Both models are written in a continuous-time state-space form, which is the form needed to perform linearizations within OpenFAST. In this article, we present the new models, perform some simple verifications against HAWC2 results, and then perform stability analyses. We investigate the contribution of the aerodynamic effects on the turbine modes, particularly the flapwise modes, which are the most affected. Because of the development presented in this work, Campbell diagrams accounting for dynamic stall and dynamic wake effects were generated for the first time using OpenFAST.

17 WIND ENERGY↗

Commissioning of a replacement subatmospheric cold box for Jefferson Lab’s Central Helium Liquefier

Jefferson Lab’s Cryogenics Department has designed, fabricated, installed, and commissioned a new subatmospheric cold box to replace one of the two existing units within our Central Helium Liquefier (CHL). The replacement cold box, dubbed SC1R, pumps saturated helium vapor at 0.0385 atm from Jefferson Lab’s continuous electron beam accelerator facility (CEBAF) cryomodules to maintain an operating temperature of nominally 2.1 K. This is accomplished using a five-stage cryogenic centrifugal compressor (cold compressor) system and a brazed aluminum plate-fin heat exchanger operating between 2.1 K and 4.5 K. In this paper we will describe our experience commissioning the SC1R cold box. We will discuss pump-down of the system to 2.1 K and steady-state operation at the cold compressor design flow rates of 170, 200, and 250 g/s. Performance of the heat exchanger and cold compressors has been mapped across a range of flow rates and optimized for CEBAF operations. This commissioning data will be used to monitor future performance and adapt to changing load requirements.

Mastracci, B.↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Flight Servicing of Robotic Refueling Mission 3

The Robotic Refueling Mission 3 (RRM3) payload launched aboard a SpaceX rocket en route to the International Space Station on December 5th, 2018. The Goddard Space Flight Center designed payload carried approximately 50 liters of liquid methane onboard, with a mission to demonstrate long term storage and transfer of the cryogenic fluid in microgravity. Kennedy Space Center (KSC) was tasked to design, fabricate, test, and operate a system equipped to fill an RRM3 dewar with liquid methane prior to launch. Though KSC has a rich history of fueling rockets and payloads, no such operations had previously been accomplished using liquid methane. As such, all of the hardware and processes had to be developed from scratch. The completed ground system design, along with the verification and validation testing will be outlined in this paper. Several challenges that were met and overcome during procurement of the high purity methane are described. In addition, budget restrictions prohibited fueling operations from occurring in traditional processing facilities. The unique and creative solutions which were required to maintain payload cleanliness during cryogenic servicing are also detailed.

Thermal Conductivity↗

Flight Servicing of Robotic Refueling Mission 3

The Robotic Refueling Mission 3 (RRM3) payload launched aboard a SpaceX rocket en route to the International Space Station on December 5th, 2018. The Goddard Space Flight Center designed payload carried approximately 50 liters of liquid methane onboard, with a mission to demonstrate long term storage and transfer of the cryogenic fluid in microgravity. Kennedy Space Center (KSC) was tasked to design, fabricate, test, and operate a system equipped to fill an RRM3 dewar with liquid methane prior to launch. Though KSC has a rich history of fueling rockets and payloads, no such operations had previously been accomplished using liquid methane. As such, all of the hardware and processes had to be developed from scratch. The completed ground system design, along with the verification and validation testing will be outlined in this paper. Several challenges that were met and overcome during procurement of the high purity methane are described. In addition, budget restrictions prohibited fueling operations from occurring in traditional processing facilities. The unique and creative solutions which were required to maintain payload cleanliness during cryogenic servicing are also detailed.

Cryogenics↗

Advances of the FRIB project

The Facility for Rare Isotope Beams (FRIB) Project has entered the phase of beam commissioning starting from the room-temperature front end and the superconducting linac segment of first 15 cryomodules. With the newly commissioned helium refrigeration system supplying 4.5K liquid helium to the quarter-wave resonators and solenoids, the FRIB accelerator team achieved the sectional key performance parameters as designed ahead of schedule accelerating heavy ion beams above 20MeV/u energy. Thus, FRIB accelerator becomes world’s highest-energy heavy ion linear accelerator. We also validated machine protection and personnel protection systems that will be crucial to the next phase of commissioning. FRIB is on track towards a national user facility at the power frontier with a beam power two orders of magnitude higher than operating heavy ion facilities. Here, this paper summarizes the status of accelerator design, technology development, construction, commissioning as well as path to operations and upgrades.

43 PARTICLE ACCELERATORS↗

Commissioning and Testing of a new 4.5K Cold Box for JLab Cryogenic Test Facility

A new 4.5K cold box at Jefferson Lab (JLab) Cryogenic Test Facility (CTF) was recently installed and commissioned to upgrade the existing 4.5 K refrigeration system and work in parallel with the existing 4.5 K cold box. This new 4.5 K cold box is equipped with two turbo-expanders and, at its maximum capacity condition, it is expected to support at least 6.6 g/s of helium liquefaction or 650 W of refrigeration at 4.5 K. It can also handle up to 10 g/s 30 K return flow for 2 K refrigeration recovery that supports cryo-module and superconducting cavity testing. Performances of the cold box at its maximum capacity conditions as well as several other operating modes were tested for acceptance. Finally, we will briefly review the new 4.5 K cold box design features and discuss the commissioning and performance testing results.

42 ENGINEERING↗

Radionuclide field lysimeter experiment (RadFLEx): geochemical and hydrological data for SRS performance assessments

The SRNL Radiological Field Lysimeter Experiment (RadFLEx) is a one-of-a-kind test bed facility designed to study radionuclide geochemical processes in the Savannah River Site (SRS) vadose zone at a larger spatial scale (from grams to tens of kilograms of sediment) and temporal scale (from months to decade) than is readily afforded through laboratory studies. RadFLEx is a decade-long project that was initiated on July 5, 2012 and is funded by six different sources. The objective of this status report is as follows: 1) to report findings to date that have an impact on SRS performance assessment (PA) calculations, and 2) to provide performance metrics of the RadFLEx program. The PA results are focused on measurements of transport parameters, such as distribution coefficients (Kd values), solubility, and unsaturated flow values. As this is an interim report, additional information from subsequent research may influence our interpretation of current results. Research related to basic understanding of radionuclide geochemistry in these vadose zone soils and other source terms are not described here but are referenced for the interested reader.

58 GEOSCIENCES↗

Modifications to JLab 12 GeV Refrigerator and Wide Range Mix Mode Performance Testing Results

Analysis of data obtained during the spring 2013 commissioning of the new 4.5-K refrigeration system at Jefferson Lab (JLab) for the 12 GeV upgrade indicated a wide capacity range with good efficiency and minimal operator interaction. Testing also showed that the refrigerator required a higher liquid nitrogen (LN) consumption for its pre-cooler than anticipated by the design. This does not affect the capacity of the refrigerator, but it does result in an increased LN utility cost. During the summer of 2015 the modifications were implemented by the cold box manufacturer, according to a design similar to the JLab 12 GeV cold box specification. Subsequently, JLab recommissioned the cold box and performed extensive performance testing, ranging from 20% to 100% of the maximum capacity, and in various modes of operation, ranging from pure refrigeration, pure liquefaction, half-and-half mix mode and at selected design modes. This testing demonstrated the modifications resulted in a LN consumption significantly lower than the expected design for the nominal and maximum capacity modes and equal to the expected design for the pure refrigeration mode (which is the most demanding). The testing also demonstrated that the refrigerator system has a good and fairly constant performance over this wide capacity range and different modes of operation. Also, a pulsed-load test, similar to what is expected for cryogenic systems supporting fusion experiments, was conducted to observe the response using the Floating Pressure ? Ganni Cycle, which was stable and robust. This paper will discuss the results and analysis of this testing pertaining to the LN consumption, the system efficiency over a wide range of capacity and different modes and the behavior of the system to a pulsed load.

Knudsen, P.↗

Performance Testing of Jefferson Lab 12 GeV Helium Screw Compressors

Oil injected screw compressors have essentially superseded all other types of compressors in modern helium refrigeration systems due to their large displacement capacity, reliability, minimal vibration, and capability of handling helium's high heat of compression. At the present state of compressor system designs for helium refrigeration systems, typically two-thirds of the lost input power is due to the compression system. It is important to understand the isothermal and volumetric efficiencies of these machines to help properly design the compression system to match the refrigeration process. It is also important to identify those primary compressor skid exergetic loss mechanisms which may be reduced, thereby offering the possibility of significantly reducing the input power to helium refrigeration processes which are extremely energy intensive. This paper summarizes the results collected during the commissioning of the new compressor system for Jefferson Lab?s (JLab?s) 12 GeV upgrade. The compressor skid packages were designed by JLab and built to print by industry. They incorporate a number of modifications not typical of helium screw compressor packages and most importantly allow a very wide range of operation so that JLab?s patented Floating Pressure Process can be fully utilized. This paper also summarizes key features of the skid design that allow this process and facilitate the maintenance and reliability of these helium compressor systems.

Knudsen, P.↗

FRIB cryogenic distribution system

The Michigan State University Facility for Rare Isotope Beams (MSU-FRIB) helium distribution system has been revised to include bayonet/warm valve type disconnects between each cryomodule and the transfer line distribution system, similar to the Thomas Jefferson National Accelerator Facility (JLab) and the Spallation Neutron Source (SNS) cryogenic distribution systems. The heat loads at various temperature levels and some of the features in the design of the distribution system are outlined. The present status, the plans for fabrication, and the procurement approach for the helium distribution system are also included.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Linac cryogenic distribution system maintenance and upgrades at JLab

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

42 ENGINEERING↗