Badge Office Process Analysis

The purpose of this process analysis was to analyze the Badge Offices’ current processes from a systems perspective and consider ways of pursuing objectives set forth by SEC-PS, namely increased customer flow (throughput) and reduced customer wait times. Information for the analysis was gathered for the project primarily through Badge Office Subject Matter Experts (SMEs), and in-person observation of prevailing processes. Using the information gathered, a process simulation model was constructed to represent current operations and allow assessment of potential process changes relative to factors mentioned previously. The overall purpose of the analysis was to provide SEC-PS management with information and recommendations to serve as a basis for additional focused study and areas for potential process improvements in the future.

99 GENERAL AND MISCELLANEOUS↗

Business Case Analysis of Prototype Fabrication Division Recapitalization Plan. Summary

Business case studies were completed to support procurement of new machines and capital equipment in the Prototype Fabrication (PF) Division SM-39 and TA-03-0102 machine shops. Economic analysis was conducted for replacing the Mazak 30Y Mill-Turn Machine in SM-39, the Haas Vertical CNC Mill in Building 102, and the Hardinge Q10/65-SP Lathe in SM-39. Analysis was also conducted for adding a NanoTech Lathe in Building 102 and a new electrical discharge machine (EDM) in SM-39 to augment current capabilities. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. Costs and benefits were defined via interviews with subject matter experts.

99 GENERAL AND MISCELLANEOUS↗

Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary

Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing, and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗