Engineering Papers⌕ Search

Engineering topics

DiMarco, J. [Fermilab]

Publications and source records attributed to DiMarco, J. [Fermilab].

Warm to cold correlations and other test results of the MQXFA Low-Beta Quadrupole magnets for the High-Luminosity Large Hadron Collider

The production of the MQXFA low-beta quadrupole magnets for the High Luminosity LHC (HL-LHC) is quite advanced with about 20 magnets cold tested in vertical cryostat. The MQXFA magnets are fabricated by the US HL-LHC Accelerator Upgrade Project (AUP) and are being used in the Q1 and Q3 Inner Triplet (IT) elements of the HL-LHC, whereas CERN is fabricating similar magnets for Q2a and Q2b IT elements. These large-aperture, high-gradient quadrupole magnets are first-of-the-kind accelerator magnets introducing Nb_3Sn conductor to High Energy Physics colliders. At this point of MQXFA production there is sufficient data to look at warm to cold correlations for the HL-LHC and for future use of Nb_3Sn magnets in particle accelerators. Examples of warm-cold correlations discussed in this paper are: field quality (including the use of magnetic shims for low-order harmonics correction), magnetic length, magnetic axis and magnetic field angle. A summary of main test data will also be presented and discussed.

Kurian, F. [Brookhaven]↗

Testing Capabilities for Superconducting Magnets at Fermilab

This presentation will focus on the current testing capabilities for superconducting magnets at Fermilab, highlighting existing systems, recent upgrades, and future plans. The Vertical Magnet Test Facility (VMTF) remains a cornerstone for testing superconducting magnets in R&D applications, maintaining its established capabilities. Stand 4 continues to support the Hi-Lumi AUP production line of magnets in cryostats and has achieved significant improvements through a redesign of lead connections, resolving issues with liquid helium levels and resistance, culminating in a successful endurance test without interruption. Similarly, Stand 7 underwent commissioning and a lead redesign to reduce heat load, while its core testing capabilities remain unchanged. Looking forward, Stand 3 is undergoing a redesign, with plans to restart and begin commissioning by the end of 2025, introducing new features such as background magnetic field testing and upgraded power supplies. Fermilab is also advancing the High Field Vertical Magnet Test Facility (HFVMTF), designed to support the fusion and magnet R&D program, with commissioning scheduled for 2025 and critical components, including the cryostat and power supplies, being delivered. Enhancing all operations, the newly commissioned IB1 cryoplant now offers automated overnight helium production and efficient transfer to a 10,000-liter dewar, streamlining support across all test stands. This talk will provide a comprehensive overview of testing capabilities, and showcasing how Fermilab is advancing its capabilities to meet the evolving demands of superconducting magnet testing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗