Engineering PapersSearch

Engineering topics

Denis, Michel

Publications and source records attributed to Denis, Michel.

Relay Communications Support to the ExoMars Schiaparelli Lander

The European Space Agency’s ExoMars Trace Gas Orbiter (TGO) arrived at Mars on October 19, 2016, three days after releasing the Schiaparelli Lander on a ballistic trajectory to Meridiani Planum. During the separation event, and subsequently during Schiaparelli’s Entry, Descent, and Landing (EDL), the NASA-provided Electra UHF payload onboard TGO was used to record signals from the Schiaparelli Lander for post-processing on the ground to recover both tracking of the lander’s carrier signal and reconstruction of the lander’s 8 kb/s telemetry. In addition, ESA’s Mars Express orbiter also recorded the Schiaparelli signal, with ground post-processing providing independent tracking of the lander carrier signal, and the Giant Metrewave Radio Telescope near Pune, India was configured to provide real-time detection of the lander carrier signal. While an anomaly in the latter stages of EDL led to loss of the lander, these critical event data sets, and in particular the telemetry reconstruction enabled by the TGO Electra recording, proved essential in enabling detailed diagnosis of the anomaly. And while the loss of the lander during EDL precluded the planned surface relay operations, the preparations for that activity provide important lessons learned for future Mars relay support scenarios.

Edwards, Charles D., Jr.

Enabling International Data Relay at Mars

The most commonly used mode of communications be-tween Earth and a Mars surface mission is ultra-high fre-quency (UHF) radio relay via a Mars orbiter. There are four orbiters and two surface rovers operating at Mars and by October there should be five orbiters and three landers or rovers. There has been some collaboration between ESA’s Mars Express orbiter and NASA’s rovers, but 2016 is when Mars relay becomes fully international. In October, ESA will deliver the ExoMars Trace Gas Orbiter (TGO) and En-try, Descent, and Landing (EDL) Demonstrator Module (EDM) lander to Mars. The ExoMars program includes both ESA and ROSCOSMOS, with NASA participation (the Electra UHF transceiver on TGO). NASA orbiters will pro-vide relay for EDM and future ESA Mars landers and rov-ers. TGO will provide relay for NASA's current and future surface assets (as Mars Express will continue to do). Inter-national collaboration is enabled in several steps. At the in-struction of the space agencies, the Mars mission projects negotiate and write a “Service Agreement.” This describes at a high level how a new Mars orbiter would operate with its corresponding surface missions or how a new surface mis-sion would operate with its corresponding orbiters. It in-cludes the roles of the different projects, how the new mis-sion would communicate with existing or planned missions, the general flow of data and commands, and the capabilities or requirements of the new mission. After completing the Service Agreement, the projects write Interface Control Doc-uments (ICDs), each of which describes data and command flow in greater detail and quantitative aspects of the relay link and operations timeline between an orbiter and a cor-responding lander/rover. Interfaces and operations are test-ed before a new mission arrives at Mars. Once at Mars, a new orbiter performs some “practice” relay contacts with its partners. For a new lander (e.g. EDM), relay operations gen-erally begin before atmospheric entry at Mars, with record-ing of the UHF relay signal from the lander (including open-loop wide-bandwidth recording) as it enters and traverses Mars’s atmosphere and lands on its surface. After Mars EDL or orbit injection, each relay contact is negotiat-ed and scheduled using the Mars Relay Operations Service (MaROS). This paper describes the international approach to develop inter-agency agreements, inter-project interfaces, and specifics of how MaROS is used in actual relay opera-tions between international partners.

Winton, Alistair J.

Relay Support for the Mars Science Laboratory Mission

The Mars Science Laboratory (MSL) mission landed the Curiosity Rover on the surface of Mars on August 6, 2012, beginning a one-Martian-year primary science mission. An international network of Mars relay orbiters, including NASA's 2001 Mars Odyssey Orbiter (ODY) and Mars Reconnaissance Orbiter (MRO), and ESA's Mars Express Orbiter (MEX), were positioned to provide critical event coverage of MSL's Entry, Descent, and Landing (EDL). The EDL communication plan took advantage of unique and complementary capabilities of each orbiter to provide robust information capture during this critical event while also providing low-latency information during the landing. Once on the surface, ODY and MRO have provided effectively all of Curiosity's data return from the Martian surface. The link from Curiosity to MRO incorporates a number of new features enabled by the Electra and Electra-Lite software-defined radios on MRO and Curiosity, respectively. Specifically, the Curiosity-MRO link has for the first time on Mars relay links utilized frequency-agile operations, data rates up to 2.048 Mb/s, suppressed carrier modulation, and a new Adaptive Data Rate algorithm in which the return link data rate is optimally varied throughout the relay pass based on the actual observed link channel characteristics. In addition to the baseline surface relay support by ODY and MRO, the MEX relay service has been verified in several successful surface relay passes, and MEX now stands ready to provide backup relay support should NASA's orbiters become unavailable for some period of time.

Telecommunications

Operations Concept for a Solar System Internetwork

Space communications to date has been largely managed at the link layer, with simple point-to-point links between a spacecraft at Earth. However, future space exploration scenarios involve much richer communications scenarios, with complex network scenarios involving space assets communicating back to Earth via multiple intermediate relay service providers. To support these more complex network scenarios, the Space Internetworking Strategy Group has developed an operations concept for a Solar System Internetwork (SSI). The operations concept draws on the successes of the terrestrial Internet while addressing unique aspects of space communications. Key elements of the operations concept include a standardized network layer across the end-to-end SSI and the underlying processes for development of a contact plan that captures the link layer connectivity among SSI network nodes.

Edwards, Charles D., Jr.

Deployment of the MARSIS Radar Antennas On-Board Mars Express

On the first European planetary mission, the deployment of the two 20-meter long MARSIS antennas onboard the ESA Mars Express spacecraft has represented an unprecedented technological challenge, in the middle of a successful science mission. While Mars Express was already performing regular observations at Mars, a complex process has been performed on Earth, involving the ESA Project, coordination between ESA, NASA and ASI, the Mars Science community, the spacecraft manufacturer EADS Astrium and the Mission Control Centre at ESOC. This paper describes the steps that led from an initial nogo in 2004 to deployment one year later, as well as the conditions and difficulties encountered during the actual deployment. It provides insights in the technical and managerial processes that made it a success, and analyses the rationale behind the decisions.

deployment