Waste Disposition Methodology at the Portsmouth Gaseous Diffusion Plant - 16469
Cost-effective and sustainable remedial design is a prudent and required approach for dealing with legacy wastes at the U.S. Department of Energy (DOE) sites. The concept of using contaminated soils as engineered fill for waste disposal facilities is a sustainable remediation process that warrants investigation. Options for cost-effective site-wide remediation were evaluated by DOE and its site contractor, including completion of evaluations for excavation of certain closed landfills and the excavation of contaminated soil in areas of known groundwater plumes to be used as engineered fill for the operation of an On-Site Waste Disposal Facility (OSWDF) at Portsmouth. The evaluations concluded that excavating select landfills and significant volumes of soil associated with the groundwater plumes considering Portsmouth site specific geology would mitigate the project lifecycle risk. As a result of this evaluation, the excavation of the landfills and soils associated with the groundwater plumes is being incorporated into the project's lifecycle baseline. On-site independent Headquarters review of this sustainable design approach and evaluation was performed in 2013 by the U.S. Army Corps of Engineers. Extensive presentations, background information, and data were provided to the independent review team along with tours of the affected areas. The review team agreed with the approach, and the Final Waste Disposition Record of Decision (ROD) for the OSWDF at the Portsmouth Site issued in June 2015, provides for the use of contaminated fill as an option provided that additional regulatory authorization/approval is obtained to use contaminated fill. Stakeholder and regulatory support is evidenced by the issuance of resolutions advocating this sustainable approach. The Commissioners of each of the four surrounding counties and the Portsmouth Site Specific Advisory Board have issued resolutions advocating this approach. They, along with other local leaders and Ohio's congressional delegation, are continuing to pursue implementation of this approach that they believe will enhance the attractiveness of the site for future re-industrialization. This approach at the Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio, is estimated to save more than $200 million over the lifecycle of the decontamination and decommissioning (D and D) project. This strategy has merit not only at Portsmouth, but perhaps other sites within the U.S. Department of Energy's Office of Environmental (EM) Management - and beyond. (authors)