Environmental Data Recorder (EDR) qualification

Qualification testing of the environmental data recorder (EDR) was successfully completed. The purpose of this test was to qualify the EDR so that it could monitor segments shipped via railcar from Utah to Kennedy Space Center (KSC). The tests consisted of a transportation and a functional test. The transportation test verified EDR operation in its intended environment. The functional test verified EDR accuracy. Data from the functional test showed that the EDR accuracies complied with requirements. Since the EDR meets or exceeds all of its test objectives, it was successfully qualified. It is recommended that the EDR replace the transportation monitoring unit (TMU). A description of the qualification procedure is presented.

Danforth, Richard A.↗

The full-scale process and design changes for elimination of insulation edge separations and voids in tang flap area

Qualification of the full-scale process and design changes for elimination of redesigned solid rocket motor tang nitrile butadiene rubber insulation edge separations and voids was performed from 24 March to 3 December 1990. The objectives of this test were: to qualify design and process changes on flight hardware using a tie ply between the redesigned solid rocket motor steel case and the nitrile butadiene rubber insulation over the tang capture features; to qualify the use of methyl ethyl ketone in the tang flap region to reduce voids; and to determine if holes in the separator film reduce voids in the tang flap region. The tie ply is intended to aid insulation flow during the insulation cure process, and thus reduce or eliminate edge unbonds. Methyl ethyl ketone is intended to reduce voids in the tang flap area by providing better tacking characteristics. The perforated film was intended to provide possible vertical breathe paths to reduce voids in the tang area. Tang tie ply testing consisted of 270 deg of the tang circumference using a new layup method and 90 deg of the tang circumference using the current layup methods. Tie ply process success was defined as a reduction of insulation unbonds. Lack of any insulation edge unbonds on the tang area where the new process was used, and the presence of 17 unbonds with the current process, proves the test to be a success. Successful completion of this test has qualified the new processes.

Danforth, Richard A.↗