Engineering Papers⌕ Search

Engineering topics

Dale, Gregory E.

Publications and source records attributed to Dale, Gregory E..

A new method for quantifying 64 Cu in nuclear debris samples

Quantifying 64 Cu in post-detonation nuclear debris samples can provide important diagnostic information regarding the structural materials used within a nuclear device. However, this task is challenging due to the weak gamma emissions associated with the decay of 64 Cu, its short half-life (12.701 h), and the presence of interfering fission product radioisotopes. Large quantities of debris sample are generally needed to accurately quantify 64 Cu, which can be problematic in sample-limited scenarios where other radiometric analyses are required. Herein, we present a new method for the separation of 64 Cu from solutions of mixed fission products and demonstrate the quantification of its activity through use of gas-flow proportional beta counting. Here, the new method was validated through a series of rigorous tests and was shown to improve the detection limit of 64 Cu by over two orders of magnitude, from 2.5 × 10 6 to 1.3 × 10 4 atoms/sample for 100 min measurements.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

LAMP Low-Energy Region Options: Workshop Report and Ranking Assessment

The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Modernization Project (LAMP) Overview [Slides]

LANSCE is based on a high-current 800 MeV proton accelerator capable of delivering 1 MW of beam power to the central target area. The LANSCE accelerator provides beam simultaneously to 5 separate experimental areas. LANSCE operates with 650 µs RF macro pulses at 120 Hz. Within this macro pulse several different beam timing patterns are utilized. LANSCE also accelerates H + and H – simultaneously. LANSCE celebrated 50 years of beam delivery in 2022.

43 PARTICLE ACCELERATORS↗