Engineering Papers⌕ Search

Engineering topics

Crawford, Aladsair J.

Publications and source records attributed to Crawford, Aladsair J..

Rapid Detection of Anomalies in Battery Energy Storage System Data

Data analytics is pivotal in assessing the technical characteristics and performance of Battery Energy Storage Systems (BESS), underpinning BESS modeling, optimization, and control. However, raw datasets frequently harbor anomalies from measurement errors and equipment malfunctions, impacting BESS reliability and analysis accuracy To address the challenge, this paper presents a novel methodology for the rapid detection of anomalous charge or discharge cycles within BESS operational data, expediting the cleaning process while ensuring data integrity. We’ve collected diverse and comprehensive real-world BESS operational datasets in collaboration with the Electric Power Research Institute and multiple Washington State utilities. These datasets serve dual roles: enabling comprehensive data exploration and analysis for understanding underlying challenges and method development, while also acting as a vital validation resource, demonstrating practical effectiveness. The proposed method detects anomalies and aids in their resolution, improving system performance characterization precision. It also reveals recurring data anomaly sources, offering insights for data collection and handling enhancement. Practitioners can gain valuable insights from the identified anomalous cycles in the real-world datasets along with the investigative process for root cause analyses and essential data cleaning steps.

Crawford, Aladsair J.↗

Incorporating Operational Uncertainties into the Dispatch of an Integrated Solar and Storage System

The economic assessment of hybrid energy systems (HES) pairing battery energy storage systems (BESSs) and photovoltaics (PV) is highly important for advancing their deployment in power systems. This paper presents an innovative assessment framework, including an optimal control policy for dispatch under uncertainty and procedures for exploring control parameters that maximize economic benefits. The proposed dispatch policy consists of two steps using system forecast information. The first step is to determine whether a BESS will be used within an operational scheduling time frame based on the probability of events and their thresholds. Once the dispatch of BESS is triggered, a model predictive control (MPC) is carried out in the second step for scheduling using the expected value of system information. By exercising this policy with different thresholds, one can explore the trade-offs between short-term benefits and battery lifetime, and identify an optimal threshold that maximizes the total economic benefits within the battery lifetime. An evaluation study in a real-world HES project is presented to illustrate the proposed framework. Compared with traditional optimal dispatch algorithms, the proposed method can significantly improve the economic benefits of an HES scheduled under forecast uncertainties.

Ma, Xu↗

Development of High Performance and Sustainable Na-ion Batteries for Stationary Electrical Energy Storage

This report describes the status of advanced sodium-ion battery research being performed at Pacific Northwest National Laboratory for the U.S. Department of Energy’s Energy Storage Systems Program. The program will demonstrate a novel sodium-ion battery pouch cell with at least 50 mAh capacity capable of achieving $100/kWh projected materials cost at an energy retention > 80% over 250 cycles.

25 ENERGY STORAGE↗

Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic Assessment

In 2017, as part of the second round of funding from the Washington State Clean Energy Fund, the Washington State Department of Commerce granted up to $\$3$ million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/4 MWh (nameplate capacity) lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. This report documents the techno-economic assessment of the integrated system, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, case studies, and analysis results.

14 SOLAR ENERGY↗

Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment

As part of the second round of the Washington Clean Energy Fund, Avista Corp received a $3.5 million matching grant in support of a shared energy economy project to test the integration of energy assets–from rooftop solar and battery storage to building energy management systems–that can be shared and used for multiple purposes. The goal of this project is to demonstrate how both the customer and the utility can benefit from this shared energy economy model and demonstrate that the electric grid can become more reliable, efficient, resilient, and flexible. Pacific Northwest National Laboratory was engaged by the U.S. Department of Energy and the Washington State Department of Commerce to work with Avista in assessing the benefits of the shared energy economy model. This report documents the techno-economic assessment of the shared energy economy model, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, and case studies and analysis results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

RFB Side Effects - Shunt Currents

The various models related to fluid flow, electrochemistry and shunt current, and their interactions are reviewed, and gaps identified in the development of flow battery holistic models. In a flow battery stack, the cells are electrically connected through the manifolds via the electrolyte. This results in shunt current through the electrolyte, which is a source of loss in the battery stack. This issue is examined in depth with a mathematical method of calculating shunt current distribution, the associated losses, and strategies to mitigate shunt current losses, along with the trade-offs.

Crawford, Aladsair J.↗

Impact of Uncertainty on Energy Storage Operation Decisions: Motivation and Framework

Energy Storage Systems (ESSs) are gaining great attention, as they can help operate grid power grids more reliably. The ESS acquisition and operation is motivated by the economics revolving around its provided services and revenue streams. These economics are greatly impacted by uncertainties in predicting the parameters which influence the ESS operation. The main goal of this paper is in addressing these uncertainties. We organize sources of uncertainties which directly impact the value-driven operation of the ESS and propose a framework which combines the uncertain requirements from processes both internal and external to ESS.

Hanif, Sarmad↗

Techno-Economic Impact of Partial String Failure in Multi-string Energy Storage Systems

Electric utilities and large industrial/commercial customers, which integrate multi-MW multi-string energy storage systems (ESS), are typically at a significant risk of string failure. This results in the loss of system performance and capacity. In order to evaluate the accurate costs and benefits associated with a particular battery system, it is essential to incorporate the costs associated with battery string failure and, as a result, reduced capacity. This report analyzes how the economic losses can be estimated based on market rules and ESS availability. A framework for calculation of economic losses is developed and implemented with an illustrative string failure case for Independent System Operator (ISO-NE) forward capacity market. Further scenarios and case studies are analyzed by varying the probability of string failure as well as the capacity bid into the market. These scenarios are used to assess the variability of economic losses and the impact of string failure on the final realized benefits from the battery's market participation.

Fotedar, Vanshika↗

Techno-Economic Impact of Partial String Failurein Multi-string Energy Storage Systems

Electric utilities and large industrial/commercial customers, which integrate multi-MW multi-string energy storage systems (ESS), are typically at a significant risk of string failure. This results in loss of system performance and capacity. In order to evaluate the accurate costs and benefits associated with a particular battery system, it is essential to incorporate the costs associated with battery string failure and, as a result, reduced capacity. This report analyzes how the economic losses can be estimated based on market rules and ESS availability. A framework for calculation of economic losses is developed and implemented with an illustrative string failure case for Independent System Operator (ISO-NE) forward capacity market. Further scenarios and case studies are analyzed by varying the probability of string failure as well as the capacity bid into the market. These scenarios are used to assess the variability of economic losses and the impact of string failure on final realized benefits from the battery's market participation.

Fotedar, Vanshika↗

Lithium-ion battery physics and statistics-based state of health model

A pseudo-2d model using COMSOL Multiphysics® software is developed to simulate performance and performance degradation of Li-ion batteries consisting of layered and olivine cathodes with graphite anode when subjected to peak shaving grid service. Multiple degradation pathways are considered, including solid electrolyte interphase (SEI) formation and breakdown at the anode, cathode dissolution and its synergistic effect on SEI formation at the anode. The model is validated by simulating commercial cylindrical cell performance. A global model is developed to simulate performance across all chemistries, along with individual chemistry models using global model parameters as initial values. There is good agreement between these models for various optimization parameters such as SEI equilibrium potential, cathode dissolution exchange current density, solvent diffusivity in the SEI and SEI ionic conductivity. To circumvent time constraints related to the COMSOL model, a 0d global model is developed which fits data well and provides more clarity on differences in cathode dissolution exchange current density. Again, good agreement for various optimization parameters is obtained among the COMSOL global & individual chemistry models and the 0-d model. The lessons learned from the physics-based model is used to develop a top down statistics-based model using current, voltage and anode volumetric change per mole lithium intercalated, along with their interactions as degradation predictors. This model predicts out of sample degradation for multiple grid services and electric vehicle drive cycle with high accuracy and provides the pathway to develop an efficient battery management system combining machine learning and findings from physics-based computationally intensive algorithms.

Crawford, Aladsair J.↗