Engineering Papers⌕ Search

Engineering topics

Conway, Z. A.

Publications and source records attributed to Conway, Z. A..

High-power test results for a cylindrical-shell silicon carbide higher-order-mode damper

The next high-current Electron-Ion Collider (EIC) is a new accelerator to be built at Brookhaven National Laboratory in collaboration with Thomas Jefferson National Accelerator Facility. In the EIC Electron Storage Ring (ESR), there will be beam currents of up to 2.5 A, which will excite massive higher-order-mode (HOM) power in the 17 single-cell 591 MHz superconducting radio-frequency (SRF) cavities. Damping the HOM power in the ESR SRF cavities is a challenge. A room temperature cylindrical shell shape silicon carbide (SiC) beamline HOM absorber (BLA) was chosen as the baseline design, due to its broadband and high-power capability, and previous demonstrations at other accelerator facilities, albeit at much lower power. Because the EIC BLA HOM power dissipation is significantly greater than the previous applications, it is imperative to carry out high-power testing to determine the maximum device performance levels achievable for thermal transport, rf breakdown, and mechanical stress, prior to finalizing the design. A SiC HOM absorber with a state-of-the-art geometry size was prototyped to verify the shrink-fit technique, test outgassing rate, and high-power handling capability. This paper presents the HOM damper’s prototyping and test results. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

High Power Test Results For A Cylindrical-Shell SiC Higher-Order-Mode DAMPER

The next high-current Electron Ion Collider (EIC) is a new accelerator to be built at Brookhaven National Laboratory (BNL) in collaboration with Thomas Jefferson National Accelerator Facility (TJNAF). In the EIC Electron Storage Ring (ESR), there will be beam currents up to 2.5 A, which will excite massive Higher-Order-Modes (HOM) power in the 17 single-cell 591 MHz Superconducting Radio Frequency (SRF) cavities. To damp the HOM power in the ESR SRF cavities is a challenge. A room temperature cylindrical shell shape Silicon Carbide (SiC) Beamline HOM Absorber (BLA) was chosen as the baseline design, due to its broadband and high-power capability, and previous demonstrations at other accelerator facilities, albeit at much lower power. Because the EIC BLA HOM power dissipation is significantly greater than the previous applications, it is imperative to carry out high power testing to determine the maximum device performance levels achievable for thermal transport, RF breakdown, and mechanical stress, prior to finalizing the design. A SiC HOM absorber with state-of-the-art geometry size was prototyped to verify shrink-fit technique, test outgassing rate, and high power handling capability. This paper presents the HOM damper’s prototyping and test results.

43 PARTICLE ACCELERATORS↗

Design Status Update of the Electron-Ion Collider

The design of the electron-ion collider EIC to be constructed at Brookhaven National Laboratory has been continuously evolving towards a realistic and robust design that meets all the requirements set forth by the nuclear physics community in the White Paper. Over the past year activities have been focused on maturing the design, and on developing alternatives to mitigate risk. These include improvements of the interaction region design as well as modifications of the hadron ring vacuum system to accommodate the high average and peak beam currents. Beam dynamics studies have been performed to determine and optimize the dynamic aperture in the two collider rings and the beam-beam performance. We will present the EIC design with a focus on recent developments.

43 PARTICLE ACCELERATORS↗

The RCS Design Status for the Electron Ion Collider

The design of the Electron-Ion Collider Rapid Cycling Synchrotron (RCS) to be constructed at Brookhaven National Laboratory is advancing to meet the injection requirements for the Electron Storage Ring (ESR). Over the past year activities are focused on developing the approach to inject two 28 nC bunches every second, up from the original design of one 10nC bunch every second. The solution requires several key changes concerning the injection and extraction kickers, charge accumulation via bunch merging and a carefully calibrated RF acceleration profile to match the longitudinal emittance required by the ESR.

Ranjbar, V. H.↗