Engineering Papers⌕ Search

Engineering topics

Conklin, Shane

Publications and source records attributed to Conklin, Shane.

Integrated science building

Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗