Engineering Papers⌕ Search

Engineering topics

Coe, B.

Publications and source records attributed to Coe, B..

In situ effective pumping speed measurements as a tool for non-evaporable getter activation and saturation monitoring

We have developed method of in situ effective pumping speed measurements based on injecting finite gas pulse into a vacuum volume and subsequent recording of pressure response using a Residual Gas Analyzer (RGA). The pressure burst caused by injected gas pulse falls exponentially in time and the exponential coefficient of such pressure decay is proportional to total effective pumping speed of all vacuum pumps acting on vacuum chamber volume. The effective pumping speed can be extracted from the dependence of injected gas species pressure vs time recorded by an RGA. Non-Evaporable Getters (NEGs) are widely used in multiple ultra and extremely high vacuum devices and applications during the last several decades. Areas of NEG applications were recently expanded into vacuum devices with relatively high-pressure levels (up to 10 -7 Torr) by the invention of high capacity ZAO NEG which can be operated at elevated temperatures. The intrinsic property of all NEG-based vacuum pumps is the reduction of their pumping speed, called “NEG saturation”, after an extended period of operation. Typical time interval for such process can span from about a month and up to a few years depending on NEG type, vacuum level of NEG pump operation, and residual gas content. After that, the NEG pump will require a re-activation cycle to restore its pumping speed close to the initial value. For many applications it is difficult to realize what is the current pumping speed of NEG pump is and when the pump should be re-activated. A method for in situ effective pumping speed measurements developed in this study can be used as a tool for NEG-based pump activation and saturation monitoring. Application of such an approach to monitor pumping status of NEG pumps was utilized and will be continually used at Extended EBIS which was recently developed and commissioned for Relativistic Heavy Ion Collider (RHIC) and future Electron Ion Collider (EIC). The results obtained during commissioning are presented and discussed.

43 PARTICLE ACCELERATORS↗

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

Gold-gold luminosity increase in RHIC for a beam energy scan with colliding beam energies extending below the nominal injection energy

The Beam Energy Scan phase II (BES-II), performed in the Relativistic Heavy Ion Collider (RHIC) from 2019 to 2021, explored the phase transition between quark-gluon plasma and hadronic gas. BES-II exceeded the goal of a fourfold increase in the average luminosity over that achieved during Beam Energy Scan phase I (BES-I), at five gold beam energies: 9.8, 7.3, 5.75, 4.59, and 3.85 GeV / nucleon. This was accomplished by addressing several beam dynamics effects, including intrabeam scattering, beam-beam, space charge, beam instability, and field errors induced by superconducting magnet persistent currents. Some of these effects are especially detrimental at low energies. BES-II achievements are presented, and the measures taken to improve RHIC performance are described. These measures span the whole RHIC complex, including ion beam sources, injectors, beam lifetime improvements in RHIC, and operation with the world’s first bunched beam Low Energy RHIC electron Cooler (LEReC).

43 PARTICLE ACCELERATORS↗

Development of highly efficient NEG pumping system for EBIS

Ultrahigh vacuum inside the ion trap volume is crucial for stable and reliable operation of an Electron Beam Ion Source (EBIS). We have developed and tested a compact linear pumping system based on the ZAO Non-Evaporable Getter (NEG) module with high pumping speed and enhanced sorption capacity for all active gases. Due to its minimal transverse dimensions, the system can be mounted adjacent to the ion trap inside a superconducting solenoid bore and will provide a pumping speed of the order of 1000 l/s for all active gases in that area. An externally supplied current (100 A DC) is used to heat the ZAO NEG up to 650 °C for more than 1 h, which is required for pump activation and/or reactivation cycles. The pumping system is being developed for use in the Extended EBIS Upgrade which is presently in progress at BNL. In conclusion, the design of the system and results of multiple tests are presented and discussed.

43 PARTICLE ACCELERATORS↗