Engineering PapersSearch

Engineering topics

Cockrell, Charles E.

Publications and source records attributed to Cockrell, Charles E..

Ares V: Shifting the Payload Design Paradigm

NASA is designing the Ares V heavy-lift cargo launch vehicle to send more crew and cargo to more places on the lunar surface than the 1960s-era Saturn V and to provide ongoing support for a permanent lunar outpost. This uncrewed cargo vehicle is designed to operate together with the Ares I crew vehicle (Figure 1). In addition to this role, however, its unmatched mass and volume capability represent a national asset for exploration, science, and commerce. The Ares V also enables or significantly enhances a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are three to five times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Modules or approximately five equivalent Hubble Space Telescopes. This mass and volume capability to low-Earth orbit (LEO) enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based solar power and mining, Earth asteroid defense, propellant depots, etc. In addition, payload designers may also have the option of simplifying their designs or employing Ares V s payload as dumb mass to reduce technical and operational risk. The Ares V team is engaging the potential payload community now, two to three years before System Requirements Review (SRR), in order to better understand the additional requirements from the payload community that could be accommodated in the Ares V design in its conceptual phase. This paper will discuss the Ares V reference mission and capability, as well as its potential to perform other missions in the future.

Sumrall, Phil

Ares V: Overview and Status

NASA has begun preliminary concept work on the vehicle. Over 1,700 alternatives have been investigated since ESAS. Focused on design of EDS, payload shroud, core stage, and RS-68 core stage engines. Recent point of departure update was made following the Lunar Capability Concept Review. Adds additional performance margin using an additional RS-68. Adds half segment on the first stage boosters . Shroud size is dictated by eventual size of Altair lunar lander. Also investigating alternate uses for Ares V not related to human space exploration . Astronomy applications (e.g., large aperture telescopes), . Deep space missions, DoD applications, Other applications.

Creech, Steve

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.

Cockrell, Charles E.

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.

Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I crew launch vehicle is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew and cargo access to the International Space Station (ISS) and, together with the Ares V cargo launch vehicle, serves as a critical component of NASA's future human exploration of the Moon. During the preliminary design phase, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements - including the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine - will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the upper stage Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, validate the ability of the upper stage to manage cryogenic propellants to achieve upper stage engine start conditions, and a high-altitude demonstration of the launch abort system (LAS) following stage separation. The Orion 1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Taylor, James L.

Enhanced Control Effector Designs for Airbreathing Transatmospheric Vehicles

A study was conducted to evaluate the potential effectiveness of a moveable cowl-trailing-edge design for airbreathing hypersonic single-stage-to-orbit (SSTO) configurations, which can be extended or deflected from the nominal position in order to provide additional pitching moment capability. This additional pitching moment capability may reduce the necessary deflection angle from conventional control surfaces and the associated trim drag penalty. Calculations for a generic SSTO configuration with baseline and modified cowl trailing edge geometries were performed at Mach 6 and 10 initially with an engineering analysis code in order to examine several design parametrics. In order to more accurately model geometries and flow physics, 2-D viscous computational fluid dynamics (CFD) predictions were obtained. FInally, a limited set of 3D CFD predictions were obtained at Mach 6 in order to show the effects of modeling 3D flow fields as well as the full 3D vehicle geometry. Comparisons of aftbody surface pressures and force and moment predictions show differences between initial predictions and 2-D CFD solutions due to geometry modeling and calculation method differences. The 3-D CFD predictions confirm the trends observed in the 2-D solutions and provide additional information on 3D effects. These analyses shows that cowl-trailing-edge extensions were effective in providing additional (nose-down) pitching moment increments as well as increased thrust compared to the baseline geometry. These effects reduce the control surface deflection angle required to trim the vehicle and the associated trim drag. Cowl-trailingedge deflections were not as effective, generating more nose-up pitching moment and decreased thrust compared to non-deflected cases.

Cockrell, Charles E.

In-space assembly-servicing requirements

A method for developing the requirements for in-space assembly, servicing, and checkout of the proposed Mars space transfer vehicles is discussed. Required in-space operations and functions are identified in relation to various Earth to Orbit (ETO) vehicles by looking at the manifesting options of baseline Mars Space Transfer Vehicles (STV). Each operation is then reduced to a minimum complexity state resulting in a set of operational primitive functions. These primitive functions are used to assess the tradeoffs between robotic, telerobotic, and EVA operations. The study demonstrates that the complexity of the in-space operations remains stable with ETO vehicle size, and therefore the functions, and ultimately the infrastructure required to support proposed missions, are relatively unaffected by varying the ETO vehicle size within the range considered for this study.

Cockrell, Charles E.

Requirements for on-orbit operations

Consideration is given to the impact of on-orbit operations during the assembly and checkout of potential piloted Mars spacecraft, and the development of the requirements for those operations. An operational scenario is developed based on assumed earth-to-orbit capability, a ground based support capability, and a baseline Mars Space Transfer Vehicle. The scenarios developed define each of the operations that must transpire at the system level, thus expanding the planning horizon for the SEI.

Cockrell, Charles E.

In-space assembly-servicing requirements

A method for developing the requirements for in-space assembly, servicing, and checkout of proposed Mars space transfer vehicles is discussed. Required in-space operations and functions are identified in relation to various Earth to Orbit (ETO) vehicles by looking at the manifesting options of baseline Mars Space Transfer Vehicles (STV). Each operation is then reduced to a minimum complexity state resulting in a set of operational primitive functions. These primitive functions are used to assess the trade-offs between robotic, telerobotic, and EVA operations. The study demonstrates that the complexity of the in-space operations remains stable with ETO vehicle size, and therefore the functions, and ultimately the infrastructure required to support proposed missions, are relatively unaffected by varying the ETO vehicle size within the range considered for this study.

Cockrell, Charles E.

On-orbit assembly operations and in-space infrastructure

The paper describes the development of a set of top-level system requirements for an in-space infrastructure which will accommodate the vehicles proposed for the Space Exploration Initiative (SEI). Issues considered include the current SEI mission strategy, the launch capability, the role of Space Station Freedom (SSF), the on-orbit assembly operations, and the manned tended versus robotic capability. Current SEI mission strategy coupled with SSF planning led to the conclusion that an independent assembly servicing facility (ASF) will best meet the requirements of the SEI program, and an analysis was performed to define the functions required at an ASF. It is shown that the ASF functions can be performed by telerobotic operations.

Cockrell, Charles E.