Engineering Papers⌕ Search

Engineering topics

Chung, Min-Kun J.

Publications and source records attributed to Chung, Min-Kun J..

Mars Reconnaissance Orbiter Navigation Strategy for the Comet Siding Spring Encounter

Comet Siding Spring encountered Mars on October 19, 2014 at a distance of about 140,500 km - the nearest comet flyby of a planet in recorded history. Mars Reconnaissance Orbiter (MRO) was able to detect the comet, gather science data, and capture images of the comet as it approached Mars. To help protect MRO from the incoming comet particles, two propulsive maneuvers were performed to position the spacecraft behind Mars at the arrival time of the expected peak particle fluency. This paper documents the strategy that the MRO Navigation Team executed to mitigate risk from the comet particles while allowing scientific observations of the comet flyby.

maneuvers↗

Mars Reconnaissance Orbiter Navigation Strategy for Dual Support of Insight and ExoMars Entry, Descent and Landing Demonstrator Module in 2016

Mars Reconnaissance Orbiter (MRO) will support NASA's InSight Mission and ESA's ExoMars Entry, Descent and Landing Demonstrator Module (EDM) in the fall of 2016 when both landers arrive at Mars. MRO provided relay support during the Entry, Descent and Landing (EDL) sequences of Mars Phoenix Lander in 2008 and the Mars Science Laboratory in 2012. Unlike these missions, MRO will coordinate between two EDL events separated by only three weeks: InSight on September 28, 2016 and EDM on October 19, 2016. This paper describes MRO Navigation's maneuver strategy to move MRO's ascending node to meet the In- Sight EDL phasing requirement and support EDM.

EDM↗

Using Mean Orbit Period in Mars Reconnaissance Orbiter Maneuver Design

Mars Reconnaissance Orbiter (MRO) has provided communication relays for a number of Mars spacecraft. In 2016 MRO is expected to support a relay for NASA's Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) spacecraft. In addition, support may be needed by another mission, ESA's ExoMars EDL Demonstrator Module's (EDM), only 21 days after the InSight coverage. The close proximity of these two events presents a unique challenge to a conventional orbit synchronization maneuver where one deterministic maneuver is executed prior to each relay. Since the two events are close together and the difference in required phasing between InSight and EDM may be up to half an orbit (yielding a large execution error), the downtrack timing error can increase rapidly at the EDM encounter. Thus, a new maneuver strategy that does not require a deterministic maneuver in-between the two events (with only a small statistical cleanup) is proposed in the paper. This proposed strategy rests heavily on the stability of the mean orbital period. The ability to search and set the specified mean period is fundamental in the proposed maneuver design as well as in understanding the scope of the problem. The proposed strategy is explained and its result is used to understand and solve the problem in the flight operations environment.

Chung, Min-Kun J.↗

GRAIL TCM-5 Go/No-Go: Developing Lunar Orbit Insertion Criteria

The Gravity Recovery and Interior Laboratory (GRAIL) mission successfully completed mapping the Moon's gravity field to an unprecedented level. The mission success was critically dependent on the success of the Lunar Orbit Insertion (LOI). It was somewhat unfamiliar as it involved an elliptical approach from a low-energy trans-lunar cruise trajectory via Sun-Earth three-body region rather than a more conventional hyperbolic approach from a direct Earth-to-Moon transfer. In addition, how its delivery dispersion affected the science formation of the two spacecraft was not well understood. In this paper we establish a set of LOI criteria to meet all the requirements and we use these criteria to establish Go/No-Go boundaries of the last, statistical Trajectory Correction Maneuvers (TCM-5s) for operations. In the end both spacecraft were found to be within the established boundaries and TCM-5s of both spacecraft were cancelled.

Chung, Min-Kun J.↗

GRAIL TCM-5 Go/No-Go: Developing Lunar Orbit Insertion (LOI) Criteria

The Gravity Recovery and Interior Laboratory (GRAIL) mission successfully completed mapping the Moon's gravity field to an unprecedented level for a better understanding of the internal structure and thermal evolution of the Moon. The mission success was critically dependent on the success of the Lunar Orbit Insertion (LOI). In this paper we establish a set of LOI criteria to meet all the requirements and we use these criteria to establish Go/No-Go boundaries of the last, statistical Trajectory Correction Maneuvers (TCM-5s) for operations.

Chung, Min-Kun J.↗

EPOXI Trajectory and Maneuver Analyses

The EPOXI mission is a NASA Discovery Mission of Opportunity combining two separate investigations: Extrasolar Planet Observation and Characterization (EPOCh) and Deep Impact eXtended Investigation (DIXI). Both investigations reused the DI instruments and spacecraft that successfully flew by the comet Tempel-1 (4 July 2005). For EPOCh, the goal was to find exoplanets with the high resolution imager, while for DIXI it was to fly by the comet Hartley 2 (4 Nov 2010). This paper documents the navigation experience of the earlier ma-neuver analyses critical for the EPOXI mission including statistical ?V analyses and other useful analyses in designing maneuvers. It also recounts the trajectory design leading up to the final reference trajectory to Hartley 2.

trajectory design↗

Spacecraft Station-Keeping Trajectory and Mission Design Tools

Two tools were developed for designing station-keeping trajectories and estimating delta-v requirements for designing missions to a small body such as a comet or asteroid. This innovation uses NPOPT, a non-sparse, general-purpose sequential quadratic programming (SQP) optimizer and the Two-Level Differential Corrector (T-LDC) in LTool (Libration point mission design Tool) to design three kinds of station-keeping scripts: vertical hovering, horizontal hovering, and orbiting. The T-LDC is used to differentially correct several trajectory legs that join hovering points. In a vertical hovering, the maximum and minimum range points must be connected smoothly while maintaining the spacecrafts range from a small body, all within the law of gravity and the solar radiation pressure. The same is true for a horizontal hover. A PatchPoint is an LTool class that denotes a space-time event with some extra information for differential correction, including a set of constraints to be satisfied by T-LDC. Given a set of PatchPoints, each with its own constraint, the T-LDC differentially corrects the entire trajectory by connecting each trajectory leg joined by PatchPoints while satisfying all specified constraints at the same time. Vertical and horizontal hover both are needed to minimize delta-v spent for station keeping. A Python I/F to NPOPT has been written to be used from an LTool script. In vertical hovering, the spacecraft stays along the line joining the Sun and a small body. An instantaneous delta-v toward the anti- Sun direction is applied at the closest approach to the small body for station keeping. For example, the spacecraft hovers between the minimum range (2 km) point and the maximum range (2.5 km) point from the asteroid 1989ML. Horizontal hovering buys more time for a spacecraft to recover if, for any reason, a planned thrust fails, by returning almost to the initial position after some time later via a near elliptical orbit around the small body. The mapping or staging orbit may be similarly generated using T-LDC with a set of constraints. Some delta-v tables are generated for several different asteroid masses.

Chung, Min-Kun J.↗

Trajectory Design of the Lunar Impactor Mission Concept

The National Aeronautics and Space Administration (NASA) solicited proposals in 2006 for an opportunity to include a small secondary payload with the launch of the Lunar Reconnaissance Orbiter (LRO) scheduled for October 2008. The cost cap of the proposal was between $50 and $80M, and the mass cap was 1,000 kilograms. JPL proposed a Lunar Impactor (LI) concept for this solicitation. The mission objective of LI was to impact the permanently shadowed region of a South polar crater ultimately to detect the presence of water. The detection of water ice would prove to be an important factor on future lunar exploration. NASA Ames Research Center also proposed a similar concept, the Lunar Crater observation and Sensing Satellite (LCROSS), which was selected by NASA for the mission. However, in this paper, the trajectory design of the LI proposed by JPL is considered. Since the LI spacecraft was to be launched on the LRO launch vehicle as a secondary payload, its initial trajectory must be diverted at some later time from the LRO trans-lunar trajectory for the subsequent impact. Several such trajectories have been considered, where each trajectory option fields some specific values for the mission parameters. The mission parameters include the availability of LRO instruments at the time of impact for the observation by LRO, the mission duration, the impact velocity, the impact angle, etc. It is possible for the LI to be deflected with a relatively low delta-V to impact a South polar crater at a reasonable impact velocity and impact angle directly with no delay. However, the instruments on-board LRO may not be ready for observation. Thus, several delayed trajectory options have been considered further. The lunar phase at the time of impact may also play an important factor for observation, especially from Earth. Several lunar flyby trajectory maneuvers have been identified to arrive at the Moon for impact at the desired lunar phase. By using a combination of these successive lunar flyby maneuvers, the impact lunar phase may be adjusted to the desired location. A few such trajectories have been suggested. Also, some attempts have been made to maximize the impact velocity by converting the impact trajectory into a retrograde orbit with respect to Earth. Since these types of trajectories take advantage of the Sun-Earth three-body region to minimize the delta-V, the mission duration is relatively long. A few such trajectories are suggested. Also, an attempt has been made to adjust the lunar impact within a desired time period for the optimum Earth observation for the above trajectories. The mission parameters resulting from each trajectory option above are considered and weighed against the cost and robustness of the mission in a brief summary.

trajectory design↗

Trajectory design for the Genesis backup orbit and proposed extended mission

In September 2004, the Genesis spacecraft will return to Earth with its collection of solar wind samples. If for some reason there are any difficulties with returning the samples to Earth during the nominal entry sequence, a contingency plan is in place for a second chance at a successful recovery. This paper will detail the processes used to generate possible backup trajectories, and provide a comparison of the contingency options examined through the course of the study.

Chung, Min-Kun J.↗