PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Medium Temperature Furnace Baking of Low-beta 650 MHz Five-cell Cavities

Medium Temperature baking of low beta 650 MHz cavities was conducted in a UHV furnace. A systematic study of cavity surface resistance components, residual and BCS, was conducted, including analyzing surface resistance due to trapped magnetic flux. Cavities showed an average 4.5 nano-ohm surface resistance at 17 MV/m under 2 K, which meets PIP-II specifications with a 40% margin. The results provided helpful information for the PIP-II project to optimize the cavity processing recipe for cryomodule application. The results were compared to the 1.3 GHz cavity that received a similar furnace baking.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Latest Development of Electropolishing Optimization for 650 MHz Cavity

Electropolishing (EP) of 1.3 GHz niobium (Nb) superconducting RF cavities is conducted to achieve a desired smooth and contaminant-free surface that yields good RF performance. Achieving a smooth surface of a large-sized elliptical cavity with the standard EP conditions was found to be challenging. This work aimed to conduct a systematic parametric EP study to understand the effects of various EP parameters on the surface of 650 MHz cavities used in PIP-II linac. Parameters optimized in this study provided a smooth surface of the cavities. The electropolished cavities met the baseline requirement of field gradient and qualified for further surface treatment to improve the cavity quality factor.

43 PARTICLE ACCELERATORS↗

The Evaluation of Mechanical Properties of LB650 Cavities

The 650 MHz cavities have a stronger requirement of niobium mechanical properties because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

Final Design of the LB650 Cryomodule for the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and its scope covers the supply of the 650 MHz low-beta cryomodule section, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and 9 production modules. An important milestone was reached in April 2023 with the Final Design Review. This paper presents the detailed design of the 650 MHz low-beta cryomodules.

43 PARTICLE ACCELERATORS↗

HB650 Cryomodule Design: From Prototype to Production

In early 2023 the assembly of the prototype HB650 cryomodule (pHB650 CM) was completed and cold tests started to evaluate its performance. The lessons learned from the design, assembly and preliminary cold tests of this cryomodule, and from the design of the SSR2 pre-production cryomodule played a fundamental role during the design optimization process of the production HB650 cryomodule (HB650 CM). Several workshops have been organized to share experiences and solve problems. This paper presents the main design changes from pHB650 to the HB650 production cryomodules and their impact on the heat loads.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which can see relatively high stress during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

43 PARTICLE ACCELERATORS↗