Engineering Papers⌕ Search

Engineering topics

Carroll, Joe

Publications and source records attributed to Carroll, Joe.

Phase 1 Study for the Phobos L1 Operational Tether Experiment (PHLOTE)

NASA's Innovative Advanced Concepts (NIAC) program selected the PHLOTE mission proposal for a 2017 Phase 1 study. This PHLOTE study provides a credible example of an innovative mission architecture that can be used to enable many future missions throughout the solar system.One of the key Phase 1 deliverables identified in the PHLOTE proposal is this Study Report which is derived from the PHLOTE Concept of Operations (ConOps) Document developed during the study. The PHLOTE ConOps describes the PHLOTE mission and also provides a key systems engineering document to support future mission development.Since this report was produced as part of a NIAC feasibility study, it is intended to be publicly released at the completion of the NIAC study. Significant support was provided through the collaboration of NASA and PHLOTE team members from Space Technology And Research (STAR) Inc. and from the Clouds Architecture Office (Clouds AO). The NASA team was supported by summer and fall interns from five separate universities.

Kempton, Kevin↗

Bare Conductive Tether for Decelerating a Spacecraft

A document describes a prototype of electrically conductive tethers to be used primarily to decelerate spacecraft and/or generate electric power for the spacecraft. Like prior such tethers, this tether is designed so that when it is deployed from a spacecraft in orbit, its motion across the terrestrial magnetic field induces an electric current. The Lorentz force on the current decelerates the spacecraft. Optionally, the current can be exploited to convert some orbital kinetic energy to electric energy for spacecraft systems. Whereas the conductive portions of prior such tethers are covered with electrical insulation except for end electrodes that make contact with the ionosphere, this tether includes a conductive portion that is insulated along part of its length but deliberately left bare along a substantial remaining portion of its length to make contact with the ionosphere. The conductive portions of the tether are made of coated thin aluminum wires wrapped around strong, lightweight aromatic polyamide braids. The main advantages of the present partly-bare-tether design over the prior all-insulated-tether design include greater resistance to degradation by the impact of monatomic oxygen at orbital altitude and speed and greater efficiency in collecting electrons from the ionosphere.

Johnson, Les↗

Design Considerations for an Integrated Solar Sail Diagnostics System

Efforts are continuing under NASA support to improve the readiness level of solar sail technology. Solar sails have one of the best chances to be the next gossamer spacecraft flown in space. In the gossamer spacecraft community thus far, solar sails have always been considered a "low precision" application compared with, say, radar or optical devices. However, as this paper shows, even low precision gossamer applications put extraordinary demands on structural measurement systems if they are to be traceable to use in space.

Jenkins, Christopher H. M.↗

Development of the Flight Tether for ProSEDS

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment will demonstrate the use of an electrodynamic tether propulsion system to generate thrust in space by decreasing the orbital altitude of a Delta 11 Expendable Launch Vehicle second stage. ProSEDS will use the flight-proven Small Expendable Deployer System to deploy a newly designed and developed tether which will provide tether generated drag thrust of approx. 0.4 N. The development and production of very long tethers with specific properties for performance and survivability will be required to enable future tether missions. The ProSEDS tether design and the development process may provide some lessons learned for these future missions. The ProSEDS system requirements drove the design of the tether to have three different sections of tether each serving a specialized purpose. The tether is a total of 15 kilometers long: 10 kilometers of a non-conductive Dyneema lead tether; 5 km of CCOR conductive coated wire; and 220 meters of insulated wire with a protective Kevlar overbraid. Production and joining of long tether lengths involved many development efforts. Extensive testing of tether materials including ground deployment of the full-length ProSEDS tether was conducted to validate the tether design and performance before flight.

Curtis, Leslie↗