Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canonsburg, Pennsylvania, UMTRCA Title I Disposal Site 35 Years Postclosure (1985-2020) - 20288

The DOE Office of Legacy Management (LM) Canonsburg, Pennsylvania, Disposal Site is a former uranium ore-processing site located in the borough of Canonsburg and an important part of US history. For 46 years (1911-1957), the site processed ore, for vanadium, radium and then uranium. Soils and groundwater beneath the site were contaminated by the milling operations. The 15-hectare (37-acre) site is owned by the US government and managed by LM, which serves as the federal land manager and steward of cultural, historical, and natural resources at Cold War legacy sites that have been successfully cleaned up to remedial standards. In 1978 Congress directed DOE to remediate 22 inactive uranium-ore processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA), in accordance with standards promulgated by the US Environmental Protection Agency in Title 40 CFR Part 192 (40 (CFR 192). Subpart B of 40 CFR 192 regulates the cleanup of contaminated groundwater at the processing sites. The radioactive materials were encapsulated in US Nuclear Regulatory Commission (NRC)-approved disposal cells, and the NRC general license for UMTRCA Title I sites is established in 10 CFR 40.27. Canonsburg was the first site to be remediated under UMTRCA. From 1983 to 1985, the Canonsburg site underwent cleanup under this US law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public. The site is unique in that it is one of only two UMTRCA Title I sites in the eastern half of the United States, the other site being the Burrell, Pennsylvania, Title I Disposal Site, a vicinity property to the Canonsburg site. It has been 35 years since the disposal cell at the Canonsburg site was completed. This paper discusses the many efforts that have been taken to maintain the site and presents some of the lessons learned concerning the long-term care of the site. The discussion includes but is not limited to the following: (1) Preserving site history so the community can better appreciate and understand the site. (2) Community outreach efforts, and the importance of maintaining transparency of environmental monitoring results with the community. (3) Pursuing reuse opportunities that offer the potential for improving the community. (4) Remaining engaged with the local community. (5) Remaining proactive in the long-term care of the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Story Maps to Enhance Public Engagement and Communication at Legacy Management Sites - 17334

The US Department of Energy's Office of Legacy Management's (LM) mission is to fulfill the department's post-closure responsibilities and to ensure protection of human health and the environment. Accomplishing that mission currently requires managing 91 legacy sites across the country by performing efficient long-term surveillance and maintenance activities, preserving and making accessible historic site records, and identifying opportunities for beneficial reuse. Integral to the success of these activities is connecting and effectively communicating with the public, governments, and other interested parties. Relationships with such entities are so important that the Office of Legacy Management has elevated such engagement to one of its strategic goals for the next 10 years. Several public engagement efforts are currently supported, including stakeholder meetings, interpretive visitor centers, hard-copy documents, and Internet-based information sources. The tools available to communicate with the public via the Internet are continually improving, and LM proactively evaluates these tools to enhance public engagement. The use of ESRI Story Maps to effectively and more succinctly communicate LM's long-term surveillance and maintenance practices is one tool currently being evaluated. Story Maps can utilize multiple types of content to engage users through site narratives, illustrations of change over time, photos, videos, and embedded links to external sources of information. The ability to illustrate site complexities via graphics and geo-spatial data is particularly useful for staff as well as communicating to stakeholders. Staff with a variety of expertise and functions in the organization can be empowered to respond to stakeholder questions using this tool. In addition, Story Maps can be easily initiated and managed in real time by LM site managers, an efficiency that would be invaluable to them as immediate site communication needs arise. A series of test Story Maps for several sites were developed to explore the capabilities of the tool. The test Story Maps included pages that described site description and overview, historical conditions and use, cleanup conditions, current monitoring data if applicable, and institutional controls. Links to existing communications tools were also incorporated in Story Maps, such as existing web sites that currently store environmental reports and the Geo-spatial Environmental Mapping System (GEMS), where stakeholders can download monitoring data. As with any tool, many things must be taken into consideration, such as: 1) Can the current IT infrastructure support the tool? 2) What data quality protocols need to be established? 2) What resources will be needed to maintain this tool? 3) What type of information should be shared? 4) Who will be responsible for information updates? This paper explores potential approaches for developing and deploying this tool for the public. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Evaluation of Story Maps to Enhance Public Engagement and Communication at Legacy Management Sites – 17334

Story Maps are being used in both public and private sectors to convey information to stakeholders, create enterprise platforms, and assist in decision making. Story Maps are web applications that combine maps, narrative text, images, and multimedia content to provide information. These applications provide a user-friendly platform to share the remarkable history of our sites, the complexity of their contamination and remediation, successes we achieve in our LTS&M activities, and even the challenges we face as we aim to fulfill our mission.

54 ENVIRONMENTAL SCIENCES↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites-17241

LM is preparing for the transfer of 11 new FUSRAP sites within the next 10 years from USACE, many of which will have substantially greater LTSM requirements than the current Completed sites. LM is analyzing the estimates for the level of effort required to monitor the new sites in order to make more customized and accurate predictions of future life cycle costs and environmental liabilities of these sites.

54 ENVIRONMENTAL SCIENCES↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from FUSRAP

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970s, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM’s inventory of sites for long-term surveillance and maintenance (LTS&M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for “unrestricted” industrial use or remediated to the “cleanup standards” at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE’s LTS&M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS&M requirements for the sites, and (3) greater involvement in the transition process.

54 ENVIRONMENTAL SCIENCES↗

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

Geographic Information System Tools for Management of US DOE Sites - 13489

The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)