Engineering Papers⌕ Search

Engineering topics

Busby, Alan

Publications and source records attributed to Busby, Alan.

Mark-18A Cold Runs

The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.

07 ISOTOPE AND RADIATION SOURCES↗

TRP Cutter Head Improvement

The current Target Rod Preparation (TRP) Cutter Head suffers from overheating problems during TPBAR breaching operations. The overheating leads to work stoppage due to the periodic need to allow the TRP Cutter Head motor to cool. This work stoppage and allowance for cooldown of the motor leads to a very inefficient TPBAR breaching process. Due to the increased need for Tritium gas, the system must be improved to increase the efficiency of the TPBAR breaching process. The project would include the following major steps: Determine likely causes of overheating of the TRP cutter head motor. Identify and research methods for cooling currently installed motor. Identify and research alternate motors for TRP cutter head. Procure a new motor for testing. Perform TPBAR breaching mockup testing with new motor. Write report on results and recommendations on potential path forward.

42 ENGINEERING↗