Engineering Papers⌕ Search

Engineering topics

Burpo, Rob

Publications and source records attributed to Burpo, Rob.

Shandiin Solar Project Development

The project is located on CBN lands 20 miles west of Albuquerque, New Mexico and will consist of approximately 200 acres of solar photovoltaic (PV) panels and other equipment with a name plate capacity of 30 Megawatts. This project has recently been incorporated under the name Shandiin Solar, LLC. The goal of this project is to provide a vehicle for CBN economic development. The U.S. Department of Energy (DOE) funded aspect of the project will be to conduct development activities for the 30 Megawatt (MW) Shandiin Solar projects, including: complete final engineering and design, obtain an interconnect agreement, obtain lease agreement, finalize financing, complete business agreements and obtain a power purchase agreement.

14 SOLAR ENERGY↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

To'Hajiilee Economic Development, Inc. (TEDI) Feasibility Study for Utility-Scale Solar

To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

14 SOLAR ENERGY↗