Engineering PapersSearch

Engineering topics

Burns, Susan H.

Publications and source records attributed to Burns, Susan H..

System, Apparatus, and Method for Active Debris Removal

Systems, apparatuses, and methods for removal of orbital debris are provided. In one embodiment, an apparatus includes a spacecraft control unit configured to guide and navigate the apparatus to a target. The apparatus also includes a dynamic object characterization unit configured to characterize movement, and a capture feature, of the target. The apparatus further includes a capture and release unit configured to capture a target and deorbit or release the target. The collection of these apparatuses is then employed as multiple, independent and individually operated vehicles launched from a single launch vehicle for the purpose of disposing of multiple debris objects.

Griffith, Sr., Anthony D.

Active Debris Removal

Orbital debris in Low Earth Orbit (LEO) is an international problem that threatens the success of future space ventures. An analysis of a wide variety of alternative solutions for active debris removal (ADR) has been performed. The solution selected is an efficient, effective, and executable solution to remove large debris in LEO, primarily spent rocket bodies. Removing large debris objects is a critical step in reducing the hazard from orbital debris, because of the large amount of medium and small debris created through large body collisions. Based on the analysis of alternatives, the concept and design for a vehicle which could efficiently address the debris hazard by disposing of several large objects per mission has been developed. This concept establishes a comprehensive, detailed technical approach for an actual end-to-end, on-orbit ADR solution to remove large debris. This robust solution enables the start of solving the problem of debris removal before it reaches a critical and potentially irreversible state by "getting there as soon as possible, as economically as possible, with the most capability".

Burns, Susan H.

Evolution of the Space Station Robotic Manipulator

The Space Station Remote Manipulator System (SSRMS), Canadarm2, was launched in 2001 and deployed on the International Space Station (ISS). The Canadarm2 has been instrumental in ISS assembly and maintenance. Canadarm2 shares its heritage with the Space Shuttle Arm (Canadarm). This article explores the evolution from the Shuttle Canadarm to the Space Station Canadarm2 design, which incorporates a 7 degree of freedom design, larger joints, and changeable operating base. This article also addresses phased design, redundancy, life and maintainability requirements. The design of Canadarm2 meets unique ISS requirements, including expanded handling capability and the ability to be maintained on orbit. The size of ISS necessitated a mobile manipulator, resulting in the unique capability of Canadarm2 to relocate by performing a walk off to base points located along the Station, and interchanging the tip and base of the manipulator. This provides the manipulator with reach and access to a large part of the Station, enabling on-orbit assembly of the Station and providing support to Extra-Vehicular Activity (EVA). Canadarm2 is evolving based on on-orbit operational experience and new functionality requirements. SSRMS functionality is being developed in phases to support evolving ISS assembly and operation as modules are added and the Station becomes more complex. Changes to sustaining software, hardware architecture, and operations have significantly enhanced SSRMS capability to support ISS mission requirements. As a result of operational experience, SSRMS changes have been implemented for Degraded Joint Operations, Force Moment Sensor Thermal Protection, Enabling Ground Controlled Operations, and Software Commutation. Planned Canadarm2 design modifications include: Force Moment Accommodation, Smart Safing, Separate Safing, and Hot Backup. In summary, Canadarm2 continues to evolve in support of new ISS requirements and improved operations. It is a tribute to the design that this evolution can be accomplished while conducting critical on-orbit operations with minimal hardware changes.

Razvi, Shakeel

Multiple manipulator control from orbiter for Space Station assembly

This paper discusses the assembly process of the Space Station Freedom. It is shown that the assembly of the Space Station will require 29 flights of the Space Shuttle Orbiter: six shuttle flights during the initial assembly stage when the Space Station will not have sufficient life-support capability; seven more flights before the Station will support human occupation independent of the presence of the Space Shuttle; and 16 more flights for achieving full operational capability. The shuttle systems to be used in the Space Station assembly are described together with the results of simulation and analyses. Special attention is given to the Space Shuttle Remote Manipulator System which will be available on all Shuttle flights to support the Space Station assembly.

Price, Charles R.