Engineering Papers⌕ Search

Engineering topics

Brown, D.

Publications and source records attributed to Brown, D..

At least 163 records · Page 9

Search for anomalous quartic WWγγ couplings in dielectron and missing energy final states in pp̄ collisions at √s=1.96 TeV

We present a search for anomalous components of the quartic gauge boson coupling WWγγ in events with an electron, a positron and missing transverse energy. The analyzed data correspond to 9.7 fb⁻¹ of integrated luminosity collected by the D0 detector in pp̄ collisions at s√=1.96 TeV. The presence of anomalous quartic gauge couplings would manifest itself as an excess of boosted WW events. No such excess is found in the data, and we set the most stringent limits to date on the anomalous coupling parameters a W 0 and a W C . When a form factor with Λ cutoff =0.5 TeV is used, the observed upper limits at 95% C.L. are |a W 0 /Λ²|<0.0025 GeV⁻² and |a W C /Λ²|<0.0092 GeV⁻².

Abazov, V. M.↗

Measurement of the ratio of differential cross sections σ(pp̄→Z+b jet)/σ(pp̄→Z+jet) in pp̄ collisions at √s=1.96 TeV

We measure the ratio of cross sections, σ(pp̄→Z+b jet)/σ(pp̄→Z+jet), for associated production of a Z boson with at least one jet. The ratio is also measured as a function of the Z boson transverse momentum, jet transverse momentum, jet pseudorapidity, and the azimuthal angle between the Z boson with respect to the highest p T b tagged jet. These measurements use data collected by the D0 experiment in Run II of Fermilab’s Tevatron pp̄ Collider at a center-of-mass energy of 1.96 TeV, and correspond to an integrated luminosity of 9.7 fb⁻¹. The results are compared to predictions from next-to-leading order calculations and various Monte Carlo event generators.

Abazov, V. M.↗

Collaboration in long-term stewardship at DOE Hanford Site

The U.S. Department of Energy&#x27;s (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation&#x27;s nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE&#x27;s Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford&#x27;s LTS Program is defined in DOE&#x27;s planning document, Hanford Long-Term Stewardship Program Plan, DOE/RL-2010-35 Rev 1. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. This paper highlights the accomplishments and collaborative efforts to address the challenges faced as work progresses from the cleanup to transitioning of land parcels to LTS Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Search for Zγ events with large missing transverse energy in pp̄ collisions at √s=1.96 TeV

We present the first search for new phenomena in Zγ final states with large missing transverse energy using data corresponding to an integrated luminosity of 6.2 fb⁻¹ collected with the D0 experiment in pp̄ collisions at √s=1.96 TeV. This signature is predicted in gauge-mediated supersymmetry-breaking models, where the lightest neutralino χ˜⁰₁ is the next-to-lightest supersymmetric particle and is produced in pairs, possibly through decay from heavier supersymmetric particles. The χ˜⁰₁ can decay either to a Z boson or a photon and an associated gravitino that escapes detection. We exclude this model at the 95% C.L. for supersymmetry-breaking scales of Λ<87 TeV.

Abazov, V. M.↗