Engineering Papers⌕ Search

Engineering topics

Broemmelsiek, D.

Publications and source records attributed to Broemmelsiek, D..

Commissioning of the IOTA Proton Injector

The Proton Injector for the IOTA storage ring (IPI) is being constructed at the Fermilab Accelerator Science and Technology facility (FAST). It will be a machine capable of delivering 20 mA pulses of protons at 2.5 MeV. IPI will operate alongside the existing electron injector beamline to facilitate further beam physics research and the continued development of novel accelerator technologies at the IOTA ring. This report details the results of the initial commissioning of IPI and an overview of the upcoming experiments with intense proton beams at IOTA.

43 PARTICLE ACCELERATORS↗

Near-Infrared Noise in Intense Electron Beams

Requirements for the noise in electron beams (NEB) have recently approached the Shot-noise level in some new applications. The density fluctuations of intense beams in the near-infrared (NIR) region are being measured at the Fermilab Accelerator Science and Technology (FAST) facility. The main goal of the experiment is to accurately compare the Shot-noise model with the observations of optical transition radiation (OTR) generated by a relativistic electron beam ($\gamma \approx 63$), transiting an Aluminium metal surface. In addition, some evidence for longitudinal space-charge-induced microbunching for the chicane-compressed beam was obtained with coherent enhancements up to 100 in the various bandwidth-filtered NIR OTR photodiode signals. With micropulse charges up to 1 nC, the beam parameters are close to those proposed for a stage in an Electron-Ion Collider (EIC) with coherent electron cooling (CEC). In this paper we present the current progress of the NEB project and compare the low electron energy measurements with ImpactX simulations.

43 PARTICLE ACCELERATORS↗

Status of the IOTA proton injector

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20\,mA pulses of protons at 2.5\,MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of~2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of the IOTA Proton Injector

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of 2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗

Strongly Tapered Helical Undulator System for Fast-greens Installation

RadiaBeam, in collaboration with UCLA and Fermilab, is developing a strongly tapered helical undulator system for the Tapering Enhanced Stimulated Superradiant Amplification experiment at 515 nm (TESSA-515). The experiment will be carried out at the FAST facility at Fermilab as a Gamma-Ray high Efficiency ENhanced Source (FAST-GREENS). The undulator system was designed by UCLA, engineered by RadiaBeam, and will be installed on the beamline at Fermilab (FNAL). The design is based on a permanent magnet Halbach scheme of four 1-meter long undulator sections; two of which have been completed and installed. The undulator period is fixed at 32 mm and the magnetic field amplitude can be tapered by tuning the gap along the interaction. Each magnet can be individually adjusted by 1 mm, offering up to 25% magnetic field tunability with a minimum gap of 5.58 mm. This paper discusses the design and engineering of the undulator system and the stage 0 installation status.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

IOTA Proton Injector Beamline Installation

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗