Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

Latest Development of Electropolishing Optimization for 650 MHz Cavity

Electropolishing (EP) of 1.3 GHz niobium (Nb) superconducting RF cavities is conducted to achieve a desired smooth and contaminant-free surface that yields good RF performance. Achieving a smooth surface of a large-sized elliptical cavity with the standard EP conditions was found to be challenging. This work aimed to conduct a systematic parametric EP study to understand the effects of various EP parameters on the surface of 650 MHz cavities used in PIP-II linac. Parameters optimized in this study provided a smooth surface of the cavities. The electropolished cavities met the baseline requirement of field gradient and qualified for further surface treatment to improve the cavity quality factor.

43 PARTICLE ACCELERATORS↗

The Evaluation of Mechanical Properties of LB650 Cavities

The 650 MHz cavities have a stronger requirement of niobium mechanical properties because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗