Engineering Papers⌕ Search

Engineering topics

Bhat, C.

Publications and source records attributed to Bhat, C..

A Novel Two Stage Collimation Unit for Fermilab Booster

A new two-stage collimation unit (2SC) for Fermilab Booster will be installed during 2024 summer shutdown. It is a supplementary collimator for existing single stage Booster collimators. Design details of this 2SC adapted to Booster conditions are described. Results of beam dynamics simulations on collimation efficiency and evaluation of collimator shielding with MARS code on this new system are presented. The analysis on beam dynamics shows that the system will help to collimate up to about 1% of the beam in a confined way and, prompt and residual activation meet Fermilab Radiological Control limits in current as well as during PIP-II era high intensity operation of the Booster.

43 PARTICLE ACCELERATORS↗

Flattening the Field during Injection in the Fermilab Booster using Dipole Corrector Magnets

The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ˜32 usec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550us. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.

43 PARTICLE ACCELERATORS↗

Full Cycle Simulations of The Fermilab Booster

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.

43 PARTICLE ACCELERATORS↗