Engineering Papers⌕ Search

Engineering topics

Berrutti, Paolo

Publications and source records attributed to Berrutti, Paolo.

Contribution of IN2P3 to PIP-II Project: Plans and Progress

IJCLab is one of the labs of IN2P3 (National institute of nuclear and particle physics), one of the ten research institutes composing the French National Center for Scientific Research (CNRS). Since 2018, IJCLab has been involved in the PIP-II project, assisting with the design, development, and qualification of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. The first pre-production components (cavity, coupler, and tuner) have been fabricated, and some of the first qualification tests have been performed at IJCLab. This paper will summarize the complete scope of IJCLab¿s contributions to PIP-II and give updates on the performances of the first pre-production components.

43 PARTICLE ACCELERATORS↗

R&D Towards High Gradient CW SRF Cavities

This talk will discuss Fermilab’s recent progress in the surface engineering of superconducting radio-frequency (SRF) cavities geared toward producing simultaneously high quality factors and high accelerating gradients in cryomodules. We investigate possible microscopic mechanisms that drive improved performance by carrying out sequential RF tests on cavities subjected to low temperature baking. We compare performance evolution to observations made with material science techniques and find correlations with material parameters. We also discuss other key advancements that enable high gradient operation in cryomodules.

43 PARTICLE ACCELERATORS↗

Progress of PIP-II Activities at IJCLab

Since 2018, IJCLab is involved in PIP-II project on the design and development of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. First pre-production components have been fabricated, surface processing and cavity qualification in vertical cryostat are on-going. IJCLab has upgraded its facilities by developing a new set-up to perform rotational BCP. The progress of all processing and testing activities for PIP-II project will be reported and, in particular, a dedicated study to qualify removal uniformity compared to static BCP will be presented.

43 PARTICLE ACCELERATORS↗