Engineering Papers⌕ Search

Engineering topics

Benjamin Abshire

Publications and source records attributed to Benjamin Abshire.

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Deployable solar array tower laser beamed power 3G↗

Lunar Surface Relay - Mobile: Concept to Provide Relay Links to Surface Assets

At the request of NASA’s Space Communication and Navigation (SCaN) program, the Glenn Research Center’s (GRC) Compass concurrent engineering team developed a conceptual design of a Lunar Surface Relay- Mobile (LSR-M) system to provide a variety of surface and relay communication links in support of future Artemis sorties. The team determined that a mobile asset, with its ability to relocate to support a variety of surface sites and leverage more hospitable winter locations on the lunar south pole, would be of particular use in the architecture. Following the design of a solar array and battery powered baseline case, a quick look design further investigated adding a multi-mission radioisotope thermoelectric generator (MMRTG) to the system to reduce battery requirements to survive the lunar night and remove the need to relocate to favorable night locations during the lunar winter.

Lunar Surface Relay↗

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU↗

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion↗