Engineering Papers⌕ Search

Engineering topics

Beller, Arthur E.

Publications and source records attributed to Beller, Arthur E..

Time management displays for shuttle countdown

The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

Beller, Arthur E.↗

Space Transportation System Meteorological Expert

The STS Meteorological Expert (STSMET) is a long-term project to acquire general Shuttle operational weather forecasting expertise specific to the launch locale, to apply it to Shuttle operational weather forecasting tasks at the Cape Canaveral Forecast Facility, and ultimately to provide an on-line real-time operational aid to the duty forecasters in performing their tasks. Particular attention is given to the development of an approach called scenario-based reasoning, with specific application to summer thunderstorms; this type of reasoning can also be applied to frontal weather phenomena, visibility including fog, and wind shear.

Beller, Arthur E.↗