Engineering PapersSearch

Engineering topics

Beech, P.

Publications and source records attributed to Beech, P..

Ulysses operations at Jupiter - Planning for the unknown

The operational preparations for the Ulysses encounter with Jupiter are described with particular attention given to requirements for survival in the Jovian environment, ground-segment planning, a deep-space network, and encounter activities. It is concluded that the successful operation of the Ulysses spacecraft at Jupiter was the culmination of many years of activity, from spacecraft design and mission planning to the coordination of the encounter activities and production of the detailed timeline.

Angold, N.

Ulysses mission operations

The Ulysses mission is described in terms of in-Shuttle operations, initial in-orbit operations, routine operations, operational organization, and data gathering and production. The configuration of the Ulysses payload is illustrated, and the flight to orbit is described including a three-hour on-orbit checkout. The first contact was reported at the Deep Space Network station followed by an adjustment of the spacecraft solar-aspect angle and the acquisition of ranging and Doppler data. In-orbit operations include the earth acquisition maneuver, a trajectory correction maneuver, and a payload switch. Continuous data gathering is discussed with reference to the Jupiter encounter and the first and second oppositions and conjunctions. The data-gathering components comprise ground stations, a data-processing computer, and a data-records system. Data production is performed in an off-line mode that does not interfere with the real-time operations.

Beech, P.

Post-launch operations and data production

Postlaunch operations scheduled in connection with the October 5, 1990, launch of Space Shuttle Discovery with the Ulysses payload are detailed. A summary is presented of postlaunch events up to and including the separation of Ulysses from Discovery, providing a timeline for the upper-stage burn and spacecraft separation. A timeline is also provided for the payload switch-on. Initial in-orbit and routine operations are discussed and missions-operations organization, the data ground segment, and Ulysses data production are considered.

Beech, P.