Engineering Papers⌕ Search

Engineering topics

Bechtel, R.

Publications and source records attributed to Bechtel, R..

An electric propulsion long term test facility

An existing test facility was modified to provide for extended testing of multiple electric propulsion thruster subsystems. A program to document thruster subsystem characteristics as a function of time is currently in progress. The facility is capable of simultaneously operating three 2.7-kW, 30-cm mercury ion thrusters and their power processing units. Each thruster is installed via a separate air lock so that it can be extended into the 7m x 10m main chamber without violating vacuum integrity. The thrusters exhaust into a 3m x 5m frozen mercury target. An array of cryopanels collect sputtered target material. Power processor units are tested in an adjacent 1.5m x 2m vacuum chamber or accompanying forced convection enclosure. The thruster subsystems and the test facility are designed for automatic unattended operation with thruster operation computer controlled. Test data are recorded by a central data collection system scanning 200 channels of data a second every two minutes. Results of the Systems Demonstration Test, a short shakedown test of 500 hours, and facility performance during the first year of testing are presented.

Trump, G.↗

A mission profile life test facility

A test facility is being prepared for a 16,000 hour mission profile life test of multiple electric propulsion thrust subsystems. The facility will be capable of simultaneously operating three 2.7 kW, 30 cm mercury ion thrusters and their power processing. The facility will permit conduction of a program of long-term tests to document thruster characteristics as a function of time and operating point to allow prediction of thruster performance for any mission profile. The thruster will be tested in a 7m by 10m vacuum chamber. Each thruster will be installed in a separate lock chamber so that it can be extended into, or extracted from the main chamber without violating the vacuum integrity of the other thruster. The thrusters will exhaust into a 3m by 5m frozen mercury target. The target and an array of cryopanels to collect sputtered target material will be liquid nitrogen chilled. Power processor units will be tested in an adjacent 1.5m by 2m vacuum chamber and will be temperature controlled by simulated heat pipes.

James, E.↗