Risk identification and reduction in integrated product teams

This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.

Batson, Robert G.

Systems engineering process and organization assessment

The purpose of this report is to briefly summarize the results of an eight week assessment of NASA/MSFC Phase A and Phase B systems engineering processes, methodologies, and activities. Specifically, fourteen inconsistencies or weaknesses were identified and recommendations for corrective action were generated. A 1.5 hour briefing on these results was given in EL51 on 8-11-92; that documentation is available from the author or either NASA Colleague.

Batson, Robert G.

Risk analysis methodology survey

NASA regulations require that formal risk analysis be performed on a program at each of several milestones as it moves toward full-scale development. Program risk analysis is discussed as a systems analysis approach, an iterative process (identification, assessment, management), and a collection of techniques. These techniques, which range from simple to complex network-based simulation were surveyed. A Program Risk Analysis Handbook was prepared in order to provide both analyst and manager with a guide for selection of the most appropriate technique.

Batson, Robert G.

Federal incentives for industrial modernization: Historical review and future opportunities

Concerns over the aging of the U.S. aerospace industrial base led DOD to introduce first its Technology Modernization (Tech Mod) Program, and more recently the Industrial Modernization Incentive Program (IMIP). These incentives include productivity shared savings rewards, contractor investment protection to allow for amortization of plant and equipment, and subcontractor/vendor participation. The purpose here is to review DOD IMIP and to evaluate whether a similar program is feasible for NASA and other non-DOD agencies. The IMIP methodology is of interest to industrial engineers because it provides a structured, disciplined approach to identifying productivity improvement opportunities and documenting their expected benefit. However, it is shown that more research on predicting and validating cost avoidance is needed.

Coleman, Sandra C.