Engineering Papers⌕ Search

Engineering topics

Bartoe, John-David F.

Publications and source records attributed to Bartoe, John-David F..

The International Space Station: A Pathway to the Future

Nearly six years after the launch of the first International Space Station element, and four years after its initial occupation, the United States and our 16 international partners have made great strides in operating this impressive Earth orbiting research facility. This past year we have done so in the face of the adversity of operating without the benefit of the Space Shuttle. In his January 14, 2004, speech announcing a new vision for America's space program, President Bush affirmed the United States' commitment to completing construction of the International Space Station by 2010. The President also stated that we would focus our future research aboard the Station on the longterm effects of space travel on human biology. This research will help enable human crews to venture through the vast voids of space for months at a time. In addition, ISS affords a unique opportunity to serve as an engineering test bed for hardware and operations critical to the exploration tasks. NASA looks forward to working with our partners on International Space Station research that will help open up new pathways for future exploration and discovery beyond low Earth orbit. This paper provides an overview of the International Space Station Program focusing on a review of the events of the past year, as well as plans for next year and the future.

Kitmacher, Gary H.↗

The International Space Station as a microgravity research platform

The International Space Station will provide a "World Class" environment for microgravity research. Ensuring this environment requires care in all aspects of its design. These aspects include consideration of the acceleration at near-orbit-tune-periods, such as gravity gradients and station drag, as well as controlling station structural dynamic modes, mechanical disturbances, and crew disturbances. Station designers must also ensure that the required acceleration environment is provided for long duration. The microgravity requirements placed on ISS will be reviewed, along with major considerations for achieving such an environment. Further, a description of the Space Station program strategy and implementation for meeting those requirements will be discussed. c2002 Published by Elsevier Science Ltd.

Spacecraft/instrumentation/standards↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

Recent progress in utilization planning for Space Station Freedom

The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.

Bartoe, John-David F.↗

Absolute solar spectral irradiance 120 nm-400 nm (Results from the Solar Ultraviolet Spectral Irradiance Monitor-SUSIM-Experiment on board Spacelab 2)

The Solar UV Spectral Irradiance Monitor experiment flown on the Spacelab-2 mission measured the absolute solar spectral irradiance in the ultraviolet spectral range 120 nm-400 nm with two spectral passbands, 0.15 and 5 nm. The photometric error was + or - 5.0 percent relative to three different absolute calibration standards. Calibration procedures and error budget are discussed. The results are reported and compared with other measurements.

Vanhoosier, Michael E.↗