Engineering Papers⌕ Search

Engineering topics

Barrows, Clayton

Publications and source records attributed to Barrows, Clayton.

54 records · Page 3

WaterModelsAnalytics.jl

WaterModelsAnalytics.jl is an analytics package for visualizing water distribution networks in Julia.

Stickel, Jonathan↗

Optimization Framework to Assess the Demand Response Capacity of a Water Distribution System

As large electricity consumers, water distribution system (WDS) pumping stations have the potential to become meaningful participants in demand response (DR) programs. The authors propose an optimization framework for assessing the DR capacity of a WDS and identifying the optimal bidding strategy for maximizing WDS revenue in the DR spot market. The proposed mixed integer linear programming (MILP) model overcomes computational constraints of previous DR optimization models by adopting a preprocessing procedure to minimize the number of binary variables and implementing a convex relaxation technique to linearize the hydraulic equations. The proposed MILP model also explicitly accounts for varying levels of risk tolerance of WDS operators by varying the recovery period over which pumping returns to business-as-usual operation. The optimization framework is implemented on a skeletonized 48-node WDS model that includes 7 pumps, 6 tanks, and 39 pipes. Using a simulated DR event and water consumption profile, the authors derive the optimal DR supply curves (i.e., compensation price versus load curtailment quantity) and revenue potential of the WDS under six scenarios for DR participation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The IEEE Reliability Test System: A Proposed 2019 Update

The evolving nature of electricity production, transmission and consumption necessitates an update to the IEEE's Reliability Test System, which was last modernized in 1996. The update introduced here introduces a generation mix more representative of modern power systems, with the removal of several nuclear and oil generating units and the addition of natural gas, wind, solar photovoltaics, concentrating solar power, and energy storage. The update includes assigning the test system a geographic location in the southwestern United States to enable the integration of spatio-temporally consistent wind, solar, and load data with forecasts. Further updates include common RTS transmission modifications in published literature, definitions for reserve product requirements and market simulation descriptions to enable benchmarking of multi-period power system scheduling problems. The final section reflects example results from a production cost modeling simulation on the updated RTS system data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-operator Production Cost Modeling

As contiguous power systems are often operated by several regional system operators, optimization models have traditionally been designed to generate optimal system-wide scheduling decisions. This report introduces an approach to reflect the existence of multiple system operators making scheduling decisions within an interconnected power system. The approach is explicitly designed to reflect each operator's limited knowledge about other regions when making scheduling decisions. Detailed analysis using a modified IEEE Reliability Test System reveals that the approach mimics real system operations by providing imperfect information to each operator about external operations and external constraints. The approach scales to a 78,000-bus model of the Eastern Interconnection, where a regression analysis provides quantitative insight into which constraints cause inefficiencies when improperly managed in a multi-operator simulation. Because the approach generates distinct regional scheduling problems, unit commitment and economic dispatch simulations can be applied to individual regions and solved in parallel, enabling production cost simulations at a previously intractable scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Planning Studies for the Renewable Energy Zone (REZ) Process

Transmission planning studies help practitioners identify the most attractive transmission options to cost-effectively connect Renewable Energy Zones (REZs) to load while sustaining the balance between generation and demand in a variety of potential operating conditions and yielding the most benefits at minimum cost. This document focuses on the transmission planning studies of the REZ Transmission Planning process to help practitioners understand the analyses involved in studying potential transmission upgrade and expansion options, the general data requirements, and the associated modeling considerations. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solar photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WaterSystems.jl

WaterSystems.jl is a Julia package for defining water delivery infrastructure system data and problem definitions. The WaterSystems.jl package enables parsing from the EPANET *.inp file format and the expression of data for WaterSimulations.jl models. WaterSystems.jl defines a data schema for water infrastructure networks.

Barrows, Clayton↗

PowerSystems.jl and PowerSimulations.jl [SWR-18-23]

Data structures in Julia to enable power systems analysis. Also, PowerSimulations.jl is a Julia package for power system modeling and simulation found at https://github.com/NREL/PowerSimulations.jl. The objectives of the package are: Provide a flexible modeling framework that can accommodate problems of different complexity and at different time-scales. Streamline the construction of large scale optimization problems to avoid repetition of work when adding/modifying model details. Exploit Julia's capabilities to improve computational performance of large scale power system simulations. The flexible modeling framework is enabled through a modular set of capabilities that enable scalable power system analysis and exploration of new analysis methods. The modularity of PowerSimulations results from the structure of the simulations enabled by the package: Simulations define a set of problems that can be solved using numerical techniques. Problems are generated by expressing model formulations against system data For example, an annual production cost modeling simulation can be created by formulating a unit commitment model against system data to assemble a set of 365 daily time-coupled scheduling problems.

Lara, Jose Daniel↗

DEPRECATED MAGMA (Multi-area Grid Metrics Analyzer) [SWR-16-31]

The DEPRECATED MAGMA software package is a package created in the R scripting language that reads a SQL database and outputs tables and figures of important data. The SQL database is created by another R package called “rplexos” and uses the .zip solution file output by PLEXOS, which is commercially available production cost modeling software.

Barrows, Clayton↗

plexos-coad (Plexos Class-Object-Attribute Data manipulation tool)

Clean energy systems including the future power grid are enabled via the development, analysis and application of advanced simulation of complex systems based on large datasets. The ability to handle and enable the simulation of complex systems allows researchers and analysts to address significant problems with greater confidence and greater levels of integrity. Parallel execution of complex systems is paramount to addressing increasing complexity. Programmatic interfaces for software configuration and parallel execution enable handling greater complexity and improving simulation integrity. The Class Object Attribute Data (COAD) software is written as a programmatic interface to the PLEXOS dataset that enables the decomposition of the dataset in time and execution in parallel without loss of integrity. COAD also enable the recomposition of solution datasets that are the output of distributed parallel execution of the core simulator.

Jones, Wes↗

Navajo Generating Station and Federal Resource Planning; Volume 1: Sectoral, Technical, and Economic Trends

This study for the U.S. Bureau of Reclamation examines conditions in the electricity sector that are likely to affect federal decisions with respect to Navajo Generating Station (NGS), the largest coal-fired power plant operating in the western United States. The federal government owns 24.3% of the 2.25-gigawatt plant, which amounts to 547 megawatts (MW) of capacity. By focusing on the unique public interests that depend on the federal share of NGS, this baseline study can help the federal government develop a road map for meeting all of its goals with respect to water delivery, clean energy, emission reduction, and economic development. There is no recommendation for action in this report. Rather, its aim is to provide a credible, thorough description of baseline conditions that might affect federal decisions regarding NGS. It describes facts and trends embedded in current data, but there are no conclusions about how Reclamation or DOI should respond to the trends. The interdependencies among the many sectoral trends and federal goals are complex, and the aim of this study is to provide a foundation from which options can be tested in a deliberate manner.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Energy Deployment in Colorado and the West: A Modeling Sensitivity and GIS Analysis

The Resource Planning Model is a capacity expansion model designed for a regional power system, such as a utility service territory, state, or balancing authority. We apply a geospatial analysis to Resource Planning Model renewable energy capacity expansion results to understand the likelihood of renewable development on various lands within Colorado.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Considering Renewables in Capacity Expansion Models: Capturing Flexibility with Hourly Dispatch

The Resource Planning Model co-optimizes dispatch and capacity expansion using a simplified, chronological dispatch period representation and high-resolution resource, load and infrastructure data. The computational tractability of capacity expansion models depends on model simplifications. We demonstrate the effects of various dispatch period representations on model results using the Resource Planning Model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of Model Structure and Detail for Utility Planning. Scenario Case Studies using the Resource Planning Model

We examine how model investment decisions change under different model configurations and assumptions related to renewable capacity credit, the inclusion or exclusion of operating reserves, dispatch period sampling, transmission power flow modeling, renewable spur line costs, and the ability of a planning region to import and export power. For all modeled scenarios, we find that under market conditions where new renewable deployment is predominantly driven by renewable portfolio standards, model representations of wind and solar capacity credit and interactions between balancing areas are most influential in avoiding model investments in excess thermal capacity. We also compare computation time between configurations to evaluate tradeoffs between computational burden and model accuracy. From this analysis, we find that certain advanced dispatch representations (e.g., DC optimal power flow) can have dramatic adverse effects on computation time but can be largely inconsequential to model investment outcomes, at least at the renewable penetration levels modeled. Finally, we find that certain underappreciated aspects of new capacity investment decisions and model representations thereof, such as spur lines for new renewable capacity, can influence model outcomes particularly in the renewable technology and location chosen by the model. Though this analysis is not comprehensive and results are specific to the model region, input assumptions, and optimization-modeling framework employed, the findings are intended to provide a guide for model improvement opportunities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗