Engineering Papers⌕ Search

Engineering topics

Barbier, Charlotte

Publications and source records attributed to Barbier, Charlotte.

Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source

A programmable signal processor-based credited safety control that calculates pulsed beam power based on beam kinetic energy and charge was designed as part of the Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS). The system must reliably shut off the beam if the average power exceeds 2.145 MW averaging over 60 seconds. System calibration requires pedigree in measurements, calibration setup, and calculations. This paper discusses the calibration of the analog beam signal components up to and including the Analog Digital Convertors (ADCs) for implementation into the Safety Programmable Logic Controllers (PLCs) and Field Programmable Gate Arrays (FPGAs).

Bobrek, Miljko↗

Design and fabrication of the waveguide Iris couplers for the Spallation Neutron Source drift tube linac

The Spallation Neutron Source (SNS) employs six cavities in the Drift Tube Linac (DTL) section to accelerate the H- ion beam to 87MeV. Each cavity is energized by a 2.5MW peak power klystron at 402.5MHz using rapid tapered waveguide iris couplers. All six original iris couplers have been in operation without replacement for over two decades. The increased RF power demands of the Proton Power Upgrade (PPU) project and operational problems, including arcing, temperature excursions, and vacuum bursts, have prompted the development of new iris coupler spares. The original iris couplers were made of GlidCop material, which is known to be mechanically strong and thermally stable, but is porous, expensive, and difficult to use in fabrication. To overcome these problems, the new spare couplers use Oxygen-Free Copper (OFC) and stainless steel (SS). This paper will discuss the mechanical, thermal and RF design, as well as challenges in the final coupler fabrication.

Lee, Sung-Woo↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

Snowmass2021 Topical Group Report from AF07: Targets and Sources

For the next multi-megawatt accelerator generation, targets and other beam-intercepting components will face even more severe challenges due to the higher power densities, higher energy, and higher radiation. A comprehensive research and development program must be implemented to address the challenges. International collaborations such as RaDIATE or High Power Targetry Workshop should be leveraged and expanded to accelerate knowledge gain and avoid duplicated efforts. The next generation of high power targets will need novel designs allowing better high heat flux cooling methods, novel materials, advanced simulations, and better instrumentation. Four main R&D tracks were identified and discussed for targets. For electron sources, current state of art and challenges we are facing for key components such as cathodes, guns and injector design for sources R&D are presented for highly polarized electrons and unpolarized high current high brightness beams. For ion sources such as electron cyclotron resonance ion source (ECRIS), laser ion source (LIS), charge breeders, status of development are reviewed, and areas require investment for future R&D are discussed separately. Facilities critical for various source development are recommended.

43 PARTICLE ACCELERATORS↗

Bifurcation Buckling Analysis and Non-Linear Collapse Analysis of Teardrop Shaped Vacuum Chamber

The Spallation Neutron Source (SNS) accelerator is being upgraded to increase the beam power from 1.4MW at 1GeV to 2.8MW at 1.3GeV. The currents in the middle two injection chicane magnets cannot simply be scaled up to accommodate the increased injection energy of 1.3GeV due to potential excessive H- stripping; the magnets must be replaced with longer, lower-field magnets and the associated vacuum chambers need to be redesigned. A new teardrop-shaped vacuum chamber was initially designed to accommodate the new magnets and the updated beam paths and instrumentation. This paper focuses on the structural stability study of the teardrop shape vacuum chamber based on buckling analysis. Protection against collapse from buckling according to the ASME BPVC requirement has been evaluated in depth. First, a Type-1 bifurcation buckling analysis using a linear eigenvalue solution to determine the critical load factor was performed. Subsequently, a Type-3 nonlinear collapse analysis was conducted using the static Riks method with elastic-plastic material properties and imperfections explicitly considered in the model geometry. The critical buckling load for the teardrop shape vacuum chamber was confidently estimated based upon this two-stage approach.

Jiang, Hao↗

Modeling Needs for High Power Target

The next generation of high power targets will use more complex geometries, novel materials, and new concepts (like flowing granular materials); however, the current numerical approaches will not be sufficient to converge towards a reliable target design that satisfies the physical requirements. We will discuss what can be improved in the next 10 years in target modeling to support high power (MW class) targets.

43 PARTICLE ACCELERATORS↗

Helium Degassing Filter for Mercury Process Gas Liquid Separator

Testing was conducted to find a suitable filter to help separate helium gas from the Spallation Neutron Source’s mercury process loop. This filter is proposed for installation on the gas-liquid separator (GLS) vent line to prevent a column of liquid mercury from flowing outside of the process loop shielding in the service bay. The filter’s desired properties are to prevent the passage of liquid mercury, provide minimal resistance to helium flow, resist radiation, operate for the lifetime of the target, be replaceable, and have a reliable construction. Testing concluded that the Mott Corporation POU-10-S series of filters provided the best performance available. The filters could stop most liquid mercury passage while allowing helium passage at nominal pressures above the GLS in standard conditions. This result has several implications for the design of the GLS vent system.

Weinmeister, Justin↗

A Compact Gas Liquid Separator for the Spallation Neutron Source Mercury Process Loop

Upgrades at the spallation neutron source (SNS) accelerator at Oak Ridge National Laboratory are underway to double its proton beam power from 1.4 to 2.8 MW. About 2 MW will go to the current first station while the rest will go to the future Second Target Station. The increase of beam power to the first target station is especially challenging for its mercury target. When the short proton beam hits the target, strong pressure waves are generated, causing cavitation erosion and challenging stresses for the target's weld regions. SNS has successfully operated reliably at 1.4 MW by mitigating the pressure wave with the injection of small Helium bubbles into the mercury. To operate reliably at 2 MW, more gas will be injected into mercury to mitigate the pressure wave further. However, the mercury process loop was not originally designed for gas injection, and the accumulation of gas in the pipes is a concern. Due to space constraints, a custom gas liquid separator (GLS) was designed to fit a 90-deg horizontal elbow space in the SNS mercury loop. Simulations and experiments were performed, and a successful design was developed that has the desired efficiency while keeping the pressure losses acceptable.

42 ENGINEERING↗