Engineering Papers⌕ Search

Engineering topics

Bambade, P

Publications and source records attributed to Bambade, P.

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Final Focus Test Facility ATF2 Status

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗