Engineering Papers⌕ Search

Engineering topics

Bainbridge, R. C.

Publications and source records attributed to Bainbridge, R. C..

NASA PERT time II

Program Evaulation and Review Technique (PERT) is disciplined management technique involving computer processing. NASA PERT Time 11 gives project manager insight into current and future project development and forewarns of potential problems. Program utilizes modular technique. Module is "fragnet"; once aspects of project are described in terms of fragnets, control network is automatically generated. Program is written in FORTRAN IV and OS Assembler for batch execution and has been implemented on IBM 370.

Bainbridge, R. C.↗

Design of automatic startup and shutdown logic for a Brayton-cycle 2- to 15-kilowatt engine

The NASA Lewis Research Center is conducting a closed-Brayton-cycle power conversion system technology program in which a complete power system (engine) has been designed and demonstrated. This report discusses the design of automatic startup and shutdown logic circuits as a modification to the control system presently used in this demonstration engine. This modification was primarily intended to make starting the engine as simple and safe as possible and to allow the engine to be run unattended. In the modified configuration the engine is started by turning the control console power on and pushing the start button after preheating the gas loop. No other operator action is required to effect a complete startup. Shutdown, if one is required, is also effected by a simple stop button. The automatic startup and shutdown of the engine have been successfully and purposefully demonstrated more than 50 times at the Lewis Research Center during 10,000 hours of unattended operation. The net effect of this modification is an engine that can be safely started and stopped by relatively untrained personnel. The approach lends itself directly to remote unattended operation.

Vrancik, J. E.↗

Improvements in and test results for the 2 to 15 kilowatt Brayton cycle electrical subsystem

The electrical subsystem of the 2- to 15-kW Brayton power conversion system consists of the auxiliary electrical equipment required for an integrated, self-contained system. For the last 2 years the electrical subsystem has been undergoing extensive tests. The first year of testing resulted in determining the performance characteristics of the electrical subsystem. During the second year several significant changes and improvements were investigated. An inverter designed for motor starting the alternator performed successfully. Some of the changes that have been made are a new alternator speed pickup, which is independent of the alternator output voltage; new, more efficient power supplies for the control system; and a volts-per-hertz reference for the alternator voltage regulator. Test data were taken on the temperature distribution of the electrical subsystem at startup conditions over a cold-plate temperature range of 25 to -50 C.

Vrancik, J. E.↗

Cold startup and low temperature performance of the Brayton cycle electrical subsystem

Cold performance tests and startup tests were conducted on the Brayton-cycle inverter, motor-driven pump, dc supply, speed control with parasitic load resistor and the Brayton control system. These tests were performed with the components in a vacuum and mounted on coldplates. A temperature range of ?25 to -50 C was used for the tests. No failures occurred, and component performance gave no indication that there would be any problem with the safe operation of the Brayton power generating system.

Vrancik, J. E.↗

Nasa pert time ii

Compiler language for NASA PERT Time II COMPUTER processing

PERT PROJECT↗