Engineering PapersSearch

Engineering topics

Bailey, Erik

Publications and source records attributed to Bailey, Erik.

BiBlade Sampling Tool Validation for Comet Surface Environments

The BiBlade sampling chain was developed for use in a potential Comet Surface Sample Return mission. Following prior versions of the sampling tool, a new tool was developed and validated to TRL 6. Sample acquisition testing was performed across a range of comet simulants and operational conditions. Tool operation was validated in a thermal-vacuum chamber. The end-to-end sampling chain was validated including sampling, sample measurement, and sample transfer. The sampling system is now ready for flight implementation.

Backes, Paul

DSENDS: multi-mission flight dynamics simulator for NASA missions

Increasingly complex space missions require powerful and flexible simulation environments in order to design, analyze, and operate the missions. NASA’s Jet Propulsion Laboratory has created the DSENDS simulation environment that addresses these needs for a wide range of space missions. In this paper, we describe the DSENDS simulation environment and the key architectural components that make DSENDS a useful simulation and analysis framework. We also overview a variety of NASA missions and flight experiments that are using DSENDS.

Sklyanskiy, Evgeniy

ALHAT System Validation

NASA has embarked on a multiyear technology development effort to develop a safe and precise lunar landing capability. The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project is investigating a range of landing hazard detection methods while developing a hazard avoidance capability to best field test the proper set of relevant autonomous GNC technologies. Ultimately, the advancement of these technologies through the ALHAT Project will provide an ALHAT System capable of enabling next generation lunar lander vehicles to globally land precisely and safely regardless of lighting condition. This paper provides an overview of the ALHAT System and describes recent validation experiments that have advanced the highly capable GNC architecture.

Brady, Tye

Under the Radar: Trials and Tribulations of Landing on Mars

The Mars Phoenix Mission requires a ground-sensing radar altimeter/ velocimeter to meet touchdown velocity requirements During Phase C/D, the radar underwent a testing triptych: a) Aerial Testing, both captive carry and tethered drop tests (36 sorties, approx. 80 hrs). b) Testing with Electronic Ground Support Equipment (EGSE) on the bench (500+ hrs). c) Detailed Simulation including both RF physics and internal firmware logic (100,000+ simulated landings). All three venues were implemented to provide sufficient uniqueness and overlap to: a) Verify the radar is meeting its requirements. b) Validate radar performance within the flight system and environment. Significant discoveries were attributed to each of the three elements of the testing triptych, leading to greatly improved EDL system robustness. An overview of the testing triptych methodology, discoveries, and responses to them will be subsequently discussed.

Mars Phoenix Mission

The Mars Exploration Rover (MER) Transverse Impulse Rocket System (TIRS)

In a very short period of time the MER project successfully developed and tested a system, TIRS/DIMES, to improve the probability of success in the presence of large Martian winds. The successful development of TIRS/DIMES played a big role in the landing site selection process by enabling the landing of Spirit on Gusev crater, a site of very high scientific interest but with known high wind conditions. The performance of TIRS by Spirit at Gusev Crater was excellent. The velocity prediction error was small and Big TIRS was fired reducing the impact horizontal velocity from approximately 23 meters per second to approximately 11 meters per second, well within the airbag capabilities. The performance of TIRS by Opportunity at Meridiani was good. The velocity prediction error was rather large (approximately 6 meters per second, a less than 2 sigma value, but TIRS did not fire which was the correct action.

Transverse Impulse Rocket System (TIRS)