Badgley, K. [Fermilab]

Publications and source records attributed to Badgley, K. [Fermilab].

Mechanical Design and Vacuum Pressure Impregnation of Combined Function Electromagnets

There are 96 combined function magnets, 48 focusing and 48 defocusing, that have been in operation in the Fermi NAL Booster without a critical failure requiring replacement for over 50 years. The Proton Improvement Plan-II (PIP-II) poses risk to these magnets and Fermilab does not currently have the tooling or knowledge of process to fabricate spares. Two new variants of these magnets are needed to reduce beam loss by having a larger aperture (Booster Gradient Defocusing Wide, or BGDS) and create space for a new injection system (Booster Gradient Defocusing Short, or BGDS). Risk of failure and need for spares will increase substantially with the implementation of PIP-II in consequence of a frequency increase from 15 Hz to 20 Hz and a 30 percent increase in peak to ground voltage. The BGDS and BGDW magnets will be fabricated in the same way as the current booster magnets so that future combined function magnet spares can be produced using learned processes.

Szabo, B. [Fermilab]↗

Testing Capabilities for Superconducting Magnets at Fermilab

This presentation will focus on the current testing capabilities for superconducting magnets at Fermilab, highlighting existing systems, recent upgrades, and future plans. The Vertical Magnet Test Facility (VMTF) remains a cornerstone for testing superconducting magnets in R&D applications, maintaining its established capabilities. Stand 4 continues to support the Hi-Lumi AUP production line of magnets in cryostats and has achieved significant improvements through a redesign of lead connections, resolving issues with liquid helium levels and resistance, culminating in a successful endurance test without interruption. Similarly, Stand 7 underwent commissioning and a lead redesign to reduce heat load, while its core testing capabilities remain unchanged. Looking forward, Stand 3 is undergoing a redesign, with plans to restart and begin commissioning by the end of 2025, introducing new features such as background magnetic field testing and upgraded power supplies. Fermilab is also advancing the High Field Vertical Magnet Test Facility (HFVMTF), designed to support the fusion and magnet R&D program, with commissioning scheduled for 2025 and critical components, including the cryostat and power supplies, being delivered. Enhancing all operations, the newly commissioned IB1 cryoplant now offers automated overnight helium production and efficient transfer to a 10,000-liter dewar, streamlining support across all test stands. This talk will provide a comprehensive overview of testing capabilities, and showcasing how Fermilab is advancing its capabilities to meet the evolving demands of superconducting magnet testing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗