LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Commissioning plan for LCLS II 2 K cold box

Commissioning of the LCLS II cryogenic plant has been planned with respect to electrical and mechanical systems checkout, equipment cleanup, cool-down, and individual performance evaluation. This plant consists of warm and cold storage, helium compressors, 4.5 K and 2 K cold boxes, and all auxiliaries typical for helium refrigeration processes. The 2 K cold box, consisting of five cold compressors in series to produce the flow and pressures necessary for 2K operation, will be the last equipment installed and, along with an additional 10,000 L helium dewar, will allow the entire plant to be commissioned as a single entity. The pre-commissioning stages, commissioning plan for 2 K cold box without connecting to the LCLS II LINAC, additional test equipment needed to simulate the loads, all process studies and associated results are described herein.

36 MATERIALS SCIENCE↗

Application of JLab 12GeV helium refrigeration system for the FRIB accelerator at MSU

The planned approach to have a turnkey helium refrigeration system for the MSU-FRIB accelerator system, encompassing the design, fabrication, installation and commissioning of the 4.5-K refrigerator cold box(es), cold compression system, warm compression system, gas management, oil removal and utility/ancillary systems, was found to be cost prohibitive. Following JLab’s suggestion, MSU-FRIB accelerator management made a formal request to evaluate the applicability of the recently designed 12GeV JLab cryogenic system for this application. The following paper will outline the findings and the planned approach for the FRIB helium refrigeration system.

43 PARTICLE ACCELERATORS↗

FRIB cryogenic distribution system

The Michigan State University Facility for Rare Isotope Beams (MSU-FRIB) helium distribution system has been revised to include bayonet/warm valve type disconnects between each cryomodule and the transfer line distribution system, similar to the Thomas Jefferson National Accelerator Facility (JLab) and the Spallation Neutron Source (SNS) cryogenic distribution systems. The heat loads at various temperature levels and some of the features in the design of the distribution system are outlined. The present status, the plans for fabrication, and the procurement approach for the helium distribution system are also included.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Progress towards the Facility for Rare Isotope Beams

Muon-based facilities offer a unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders ranging from the Higgs energy to the multi-TeV energy range. They rely on novel technology with challenging parameters, for which the feasibility is currently being assessed by the U.S. Muon Accelerator Program (MAP) [1]. A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned at Fermilab, especially Project X and LBNE. Each stage is defined in such a way as to provide an R&D platform to validate the technologies required for subsequent stages. The rationale and sequence of a realistic staging process are presented.