Engineering PapersSearch

Engineering topics

Apresyan, Artur

Publications and source records attributed to Apresyan, Artur.

Towards High-Efficiency Particle Detection Using Superconducting Microwire Arrays

We present a detailed study of an 8-channel $1\times1$~mm$^{2}$ WSi superconducting microwire single photon detector (SMSPD) array exposed to 120~GeV hadron beam and 120~GeV muon beam at the CERN Super Proton Synchrotron H6 beamline. Following up on our first detailed characterization of the efficiency and response of an SMSPD fabricated on a 3~nm WSi film, we report measurements of enhanced particle detection efficiency using a sensor fabricated from a thicker 4.7~nm-thick WSi film. We also report the first SMSPD detection efficiency measurement made for muons. Measurements are enabled by a silicon tracking telescope providing 10~$\mu$m in situ spatial resolution. The results show a detection efficiency of 75\% and a time resolution of about 130~ps across pixels. These findings represent a significant advancement toward developing high-efficiency SMSPD charged particle tracking systems with simultaneous precision timing, with potential applications in future accelerator-based experiments such as the FCC-ee and Muon Collider.

Wang, Christina [Fermilab]

The Muon Collider

Muons offer a unique opportunity to build a compact high-energy electroweak collider at the 10 TeV scale. A Muon Collider enables direct access to the underlying simplicity of the Standard Model and unparalleled reach beyond it. It will be a paradigm-shifting tool for particle physics representing the first collider to combine the high-energy reach of a proton collider and the high precision of an electron-positron collider, yielding a physics potential significantly greater than the sum of its individual parts. A high-energy muon collider is the natural next step in the exploration of fundamental physics after the HL-LHC and a natural complement to a future low-energy Higgs factory. Such a facility would significantly broaden the scope of particle colliders, engaging the many frontiers of the high energy community. The last European Strategy for Particle Physics Update and later the Particle Physics Project Prioritisation Panel in the US requested a study of the muon collider, which is being carried on by the International Muon Collider Collaboration. In this comprehensive document we present the physics case, the state of the work on accelerator design and technology, and propose an R\&D project that can make the muon collider a reality.

Accelerator Physics (physics.acc-ph)

MuCol Milestone Report No. 5: Preliminary Parameters

This document is comprised of a collection of updated preliminary parameters for the key parts of the muon collider. The updated preliminary parameters follow on from the October 2023 Tentative Parameters Report. Particular attention has been given to regions of the facility that are believed to hold greater technical uncertainty in their design and that have a strong impact on the cost and power consumption of the facility. The data is collected from a collaborative spreadsheet and transferred to overleaf.

43 PARTICLE ACCELERATORS

Interim report for the International Muon Collider Collaboration (IMCC)

The International Muon Collider Collaboration (IMCC) [1] was established in 2020 following the recommendations of the European Strategy for Particle Physics (ESPP) and the implementation of the European Strategy for Particle Physics-Accelerator R&D Roadmap by the Laboratory Directors Group [2], hereinafter referred to as the the European LDG roadmap. The Muon Collider Study (MuC) covers the accelerator complex, detectors and physics for a future muon collider. In 2023, European Commission support was obtained for a design study of a muon collider (MuCol) [3]. This project started on 1st March 2023, with work-packages aligned with the overall muon collider studies. In preparation of and during the 2021-22 U.S. Snowmass process, the muon collider project parameters, technical studies and physics performance studies were performed and presented in great detail. Recently, the P5 panel [4] in the U.S. recommended a muon collider R&D, proposed to join the IMCC and envisages that the U.S. should prepare to host a muon collider, calling this their "muon shot". In the past, the U.S. Muon Accelerator Programme (MAP) [5] has been instrumental in studies of concepts and technologies for a muon collider.

43 PARTICLE ACCELERATORS

Assembly of CMS Endcap MIP Timing Detector Module at FNAL

The High-Luminosity LHC (HL-LHC) will enable a more detailed exploration of new phenomena thanks to an anticipated increase in collisions where pileup is expected to reach approximately 200 simultaneous interactions. Many CMS systems will be significantly upgraded to prepare for this new era, including the MIP Timing Detector (MTD) project. The MTD is designed to mitigate the effect of pileup and is set to provide a timestamp accurate to 30 ~ 40 picoseconds for every event, ensuring sustained detector performance at HL-LHC. The MTD is divided into two sections, Barrel Timing Layer (BTL) and Endcap Timing Layer (ETL) which utilize different sensor and ASIC technologies due to the difference in active surfaces, irradiation conditions, and installation schedules. The ETL, composed of two double-sided disks, employs the Low Gain Avalanche Detector (LGAD) sensor and the Endcap Timing Readout Chip (ETROC). More than 8,000 modules, each consisting of four LGAD sensors and ETROCs are required for the ETL detector. These modules will be assembled using an automated robotic gantry that guarantees precise placement at a level of 10 micrometers. In addition, the full assembly of ETL modules includes film application with the jig, wire-bonding, encapsulation with the automated dispensing robot for protecting the wire-bonding, and film curing with a vacuum oven. This talk reports on the successfully completed throughput test with mockup components using the gantry and the successful assembly of real functional modules for beam tests at CERN and FNAL, including the first official ETL module.

Apresyan, Artur

Radiation Hardened Engineered Substrates for Time and Space Resolution

Low Gain Avalanche Diodes (LGADs) have become sensors of choice for fast timing of minimum ionizing particles. The current generation of these devices suffer from only moderate radiation hardness, low fill factor, and limited design options. Cactus Materials Inc. proposes to develop sensors with gain layer implants buried beneath the surface which will, with AC coupling developed by Brookhaven National Laboratory (BNL) and University of California Santa Cruz (UC Santa Cruz) solve these problems. Fermilab has a major role in the CMS timing upgrade using the current generation of LGADs and development of AC-coupled, buried layer LGADs will solve some of the central problems inherent in this technology. Annex B included a two-year work plan, deliverables, schedule and funding for the project’s SBIR Phase II award to develop and test prototype LGADs utilizing wafer bonding technology and epitaxial growth, that will allow for fabrication of radiation hard AC coupled devices with 100% fill factor and adjustable operating point.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND